The railway bridge over road III/018149 and the Rakovec stream

Subject of the contract:

Steel Structure Fabrication and Installation

The bridge is a six-span structure with an upper deck and a continuous ballast track. Each track is supported by a separate load-bearing structure, with the individual structures separated by a covered expansion joint. The structures are composite steel-concrete. The superstructure is supported on abutments and piers via pot bearings. The abutments and piers are monolithic reinforced concrete, founded on deep foundations using large-diameter bored piles. Total length of the steel structure: 193.5 m.

Category:
Location:
Svit - Štrba
Implementation period:
2021
Steel structure weight:
Scroll to Top

Categories