Saint Gobain Weber Terranova

Subject of the contract:

Steel Structure Fabrication and Installation

The Plaster Mix Production Plant project for Saint-Gobain Weber Terranova involved the complete fabrication and installation of steel structures for the production halls and the process tower, including the supply and installation of roof and wall cladding.

The scope of work comprised the fabrication and erection of the steel supporting structures for the production buildings and the process tower, as well as the installation of the roof and wall cladding system. All activities were carried out with a strong emphasis on manufacturing precision, high-quality workmanship, coordinated on-site execution, and full compliance with the technical requirements of the project documentation.

The completed project resulted in a modern industrial facility featuring robust steel structures and a high-quality building envelope, designed to ensure structural integrity, operational functionality, and long-term reliability in the production of construction materials.

Location:
Bratislava
Implementation period:
2007
Steel structure weight:
Scroll to Top

Categories