As part of the Danubius Fruct storage hall project in Miloslavov, we carried out the fabrication and installation of the steel structure for STABILIT, spol. s r. o. The structure was designed for a facility intended for post-harvest fruit processing and storage, with a strong emphasis on structural stability, reliability, and efficient use of the interior space for technological equipment and storage capacity.
Our scope of work included the fabrication of steel components, their transportation to the construction site, and professional on-site installation in accordance with the project documentation. Precise workmanship and high-quality installation resulted in a modern storage facility that meets demanding standards for functionality, safety, and long-term operational reliability.
Project value: EUR 717,753