Steel structure of the EUROVEA TOWER crown

Subject of the contract:

Steel Structure Fabrication and Installation

Our company participated in the construction of the first skyscraper in Slovakia by fabricating the steel structure of the tower crown. The structure begins at the upper floors (45th floor) and extends above the roof level to a height of 168 m.

It consists of 12 box-section columns arranged around the perimeter of the building in an irregular triangular layout, interconnected by a system of three horizontal rings.

The project received an award for exceptional construction quality.
Read more here: The first Slovak skyscraper wins an award for exceptional construction quality | JTRE https://www.jtre.sk/novinky/eurovea_tower_ziskal_cenu_za_mimoriadnu_kvalitu_realizacie_stavby

Location:
Bratislava
Implementation period:
2022
Steel structure weight:
Scroll to Top

Categories