Reconstruction of Railway Bridges on the Plzeň – Žatec Railway Line

Subject of the contract:

Assembly and Welding of Steel Structures

Our company participated in the installation, assembly, and welding of the load-bearing steel structure of the railway bridge as part of the reconstruction of bridge structures on the Plzeň – Žatec railway line.

The original steel structure was replaced with a new truss structure featuring a lower deck and continuous ballast track bed, providing a modern and technically efficient solution for the bridge structure.
The project formed part of a comprehensive modernization of the railway line aimed at the renewal of bridge structures and the improvement of safety, reliability, and operational capacity of rail transport.

Location:
Plasy
Implementation period:
2025
Steel structure weight:
170 tonnes
Scroll to Top

Categories