Railway Bridge Smiřice – Jaroměř

Subject of the contract:

Steel Structure Fabrication and Installation

SO 240 Railway Bridge over the Relocated I/33 Road at km 44.179 of the Jaroměř–Dvůr Králové Line

The structure is a permanent single-track bottom-deck bridge. The load-bearing system comprises truss-stiffened girders acting compositely with the deck. The steel structure weighs 152 tonnes in total and the bridge has an overall length of 59.55 m.

Category:
Location:
Jaroměř
Implementation period:
2018
Steel structure weight:
152 tonnes
Scroll to Top

Categories