On the project of the R2 bridge over the Slatina River and road III/05098, our company participated in the fabrication and erection of the steel structure of a major bridge object constructed as part of the R2 expressway near Detva. The project represented an important component in the development of transport infrastructure in central Slovakia and contributed to improved traffic safety and traffic flow in the region.
The bridge structure spans both the Slatina River and road III/05098 and was designed as part of the four-lane divided R2 expressway of category R 24.5/100. The bridge width arrangement corresponds to the parameters of a modern high-speed road with a clear width of 11.25 meters for each traffic direction. In spans 1 and 2, the bridge is widened due to the connection to the Detva interchange.
The steel structure of the bridge has a total weight of 1,465 tons and a steel section length of 349.9 meters, making the project one of the significant bridge realizations in our portfolio. The execution required a high level of technical precision, coordination, and experience in the erection of large-scale steel structures for transport infrastructure projects.