Our company carried out the fabrication and installation of the steel structure, including cladding works, for the “Púchov Sports Complex” project.
The building forms an extension of a multifunctional sports hall with overall dimensions of 42.0 × 58.65 m, while the hotel section is extended to a width of 43.41 m. Functionally, the building is divided into a basement section with storage facilities and a wellness area with swimming pools, a tennis hall, and a hotel section.
The completed steel structure consists of columns, trusses, girders, and horizontal bracing systems, including supporting structures for walkways and the spectator stand. From a structural perspective, the building represents a combined skeletal system composed of reinforced concrete columns and steel roof structures. The vertical load-bearing elements are reinforced concrete columns arranged in a modular grid, positioned at 5.5 m intervals on the shorter side and 6 m intervals on the longer side of the building perimeter.
Steel truss girders with a pitched-roof configuration are installed longitudinally on the columns, into which steel lattice beams are anchored. This solution created a lightweight yet flexible spatial truss structure. The perimeter walls are made of prefabricated insulated concrete panels, above which a lightweight sandwich façade system was installed, consisting of trapezoidal sheet metal, thermal insulation, and steel cassette panels.
The entire structure was designed and executed efficiently, safely, and in compliance with current applicable technical standards.