Piping energy bridge

Subject of the contract:

Turnkey construction

Our company is delivering a turnkey project for a pipe bridge, including earthworks, foundations, and the subsequent supply and installation of the steel structure with trapezoidal sheet cladding. The load-bearing structure consists of two steel truss girders supported in the top chord, forming a spatial truss system. The main truss girders are fully welded. Global stability is ensured by horizontal and vertical diagonal bracing. The structure is supported by steel pylons, which are fixed into the foundations. A secondary structure on the top of the truss system is designed to carry cable trays for utility routing. The bridge is covered with a mono-pitch roof clad with trapezoidal sheet metal.

Location:
Dubnica nad Váhom
Implementation period:
2025
Steel structure weight: