As part of the PELLENC production hall project in Nové Mesto nad Váhom, we carried out the fabrication and installation of the steel structure for STABILIT, spol. s r. o. The primary steel structure was designed and manufactured with a strong focus on structural reliability, precision workmanship, and creating an optimal environment for modern manufacturing technologies.
Our scope of work included the fabrication of steel components, their transportation to the construction site, and professional on-site installation in accordance with the project documentation. Precise fabrication, high-quality assembly, and careful execution resulted in a modern production hall that meets demanding standards for safety, functionality, and long-term operational reliability.