Our company’s role in this project, which we carried out for TSS Group a.s., was the „Reconstruction of the Bridge to the Island in Trenčín“. The project focused on modernising the transport infrastructure, increasing traffic safety and improving conditions for pedestrians and cyclists. The main objective of the project was to widen the road, increase the bridge’s clear width and construct new steel footbridges for pedestrians and cyclists. The steel structures of the footbridges also serve as a supporting system for utility networks.
The reconstruction included strengthening the load-bearing structure of the reinforced concrete girder bridge using external prestressing cables and additional shear reinforcement. The works also involved correcting permanent deflections of the bridge structure, replacing bearings, renewing the roadway surface including waterproofing, and upgrading the drainage system through composite continuous curb drainage channels.
As part of the project, new safety barriers, railings, and lighting poles were installed, contributing to greater safety and comfort for all road users. The completed reconstruction resulted in a modern bridge structure that meets current requirements for traffic capacity, safety, and long-term operational reliability.
Total contract value: €3,496,003