The project involved the extension and structural modification of the operational building of SEC spol. s r.o., including the construction of Assembly Hall G. The scope of work comprised the fabrication and installation of the steel supporting structure, crane runway beams, wall and roof cladding, as well as the installation of windows and doors.
The project required precise fabrication of individual structural components, careful coordination of construction activities, and strict adherence to high quality standards. The result is a modern industrial facility designed to ensure functionality, reliability, and long-term operational performance.
The total value of the project was EUR 605,627.26.