We carried out a complete reconstruction of the “Leharsteg pedestrian bridge”, focusing on restoring its technical condition, increasing the durability of the structure, and extending its service life.
The works included thorough abrasive blasting of the steel components, removal of corrosion and contaminants, surface preparation for the application of a new protective coating system, and the subsequent execution of the surface treatment. The reconstruction was performed with a strong emphasis on quality workmanship, long-term protection of the structure against environmental influences, and ensuring reliable functionality.
The result is a refurbished structure with improved corrosion resistance, enhanced aesthetic appearance, and a significantly extended service life. High-quality anti-corrosion protection is one of the key factors in maintaining the safety and long-term reliability of steel pedestrian bridges.