Construction of a New Heat and Power Source

Subject of the contract:

Steel Structure Fabrication and Installation

The facility is a single-storey hall-type building. The main load-bearing structure is designed as a steel frame. The hall also includes supplementary steel structures such as bracings, crane runways, technological platforms, pipe supports, and other elements, all integrated with the main steel frame.

Location:
Žilina
Implementation period:
2024 - 2025
Steel structure weight:
Scroll to Top

Categories