Torysa River Bridge

Subject of the contract:

Steel Structure Fabrication and Installation

Fabrication and installation of a steel bridge structure with a total weight of 1,018 tonnes and a steel section length of 163.42 m.

The bridge consists of two independent load-bearing structures, each carrying one traffic direction. The superstructure is designed as a continuous composite reinforced concrete system with three spans. It is formed by a pair of steel plate girders, transverse beams, and intermediate truss cross girders. At both end and internal supports, the structure is seated on pairs of bearings located beneath the main girders.

Category:
Location:
Prešov
Implementation period:
2016-2017
Steel structure weight:
1,018 tonnes