Morava River Footbridge

Subject of the contract:

Steel Structure Fabrication and Installation

Fabrication and installation of the steel structure of the Morava River Footbridge, including the access road within the Mikulčice–Kopčany Archaeological Park

The bridge structure is designed as a slender steel construction with a composite reinforced concrete orthotropic deck slab. The total length of the load-bearing structure is 140.0 m (approach span 24.35 m – arch section 91.35 m – approach span 24.35 m). The structure is a Langer girder system consisting of a pair of truss parapet girders, each stiffened by a steel arch and steel hangers. The bridge has a closed configuration with a bottom deck. The railing is formed by the main girders with cable infill and has a height of 1300 mm. The arch section of the steel structure is 91.3 m long with a weight of 204 tons. Installation works required a 35-ton crane for fabrication elements, an 80-ton crane for the approach spans, and a 750-ton crawler crane for lifting the pre-assembled 91.3 m main section (217 tons), positioned on a reinforced area on the Kopčany side near the Morava River.

Category:
Location:
Mikulčice-Kopčany
Implementation period:
2018-2019
Steel structure weight:
Scroll to Top

Categories