Reconstruction of the Railway Bridge in Plasy

Subject of the contract:

Assembly and Welding of Steel Structures

Our company carried out the installation, assembly, and welding of the load-bearing steel structure of a railway bridge on the Plzeň–Žatec line.
The original steel structure was replaced with a new one. The bridge features a truss structure with a bottom deck and continuous track bed, which was partially welded in Záboří.

Location:
Plasy
Implementation period:
2025
Steel structure weight:
169,862 kg
Scroll to Top

Categories