<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Referencie &#8211; STAVOKOV</title>
	<atom:link href="https://www.stavokov.sk/en/references/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.stavokov.sk</link>
	<description>Oceľové konštrukcie</description>
	<lastBuildDate>Mon, 20 Jul 2026 09:16:43 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.2</generator>

<image>
	<url>https://www.stavokov.sk/wp-content/uploads/2024/11/cropped-Asset-1-32x32.png</url>
	<title>Referencie &#8211; STAVOKOV</title>
	<link>https://www.stavokov.sk</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Morava River Footbridge</title>
		<link>https://www.stavokov.sk/en/references/morava-river-footbridge/</link>
					<comments>https://www.stavokov.sk/en/references/morava-river-footbridge/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Mon, 13 Apr 2026 09:35:38 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5567</guid>

					<description><![CDATA[For the project of the footbridge over the Morava River in the Archeologický park Mikulčice–Kopčany, our company carried out the [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="103" data-end="478"><strong><em>For the project of the footbridge over the Morava River in the <span class="hover:entity-accent entity-underline inline cursor-pointer align-baseline"><span class="whitespace-normal">Archeologický park Mikulčice–Kopčany</span></span>, our company carried out the fabrication and professional installation of the steel structure, including the access road. The structure represented a combination of technical precision, high-quality craftsmanship, and a sensitive approach to a unique historical environment.</em></strong></p>
<p data-start="480" data-end="1003"><em>The bridge structure is designed as a slender steel structure with a steel-concrete composite reinforced deck slab. The total length of the load-bearing structure is 140.0 m (approach span 24.35 m – arch section 91.35 m – approach span 24.35 m). It is a Langer beam system formed by a pair of truss parapet girders, each reinforced by a steel arch and steel hangers. The footbridge has a closed configuration with a lower deck. The railing system consists of the main girders with cable infill and has a height of 1,300 mm.</em></p>
<p data-start="1005" data-end="1447"><em>The length of the arch section of the steel structure is 91.3 m with a weight of 204 tons. For handling of fabricated components, a 35-ton crane was used. An 80-ton crane was used for installation of the approach spans, and a 750-ton crawler crane was used for the installation of the pre-assembled 91.3 m long main section (217 t), positioned on the Kopčany side on a reinforced working platform within the berm area facing the Morava River.</em></p>
<p data-start="1449" data-end="1498"><em>The total project cost amounted to <strong>EUR 1,299,327</strong>.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/morava-river-footbridge/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Bridge Přerov</title>
		<link>https://www.stavokov.sk/en/references/bridge-prerov/</link>
					<comments>https://www.stavokov.sk/en/references/bridge-prerov/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Mon, 13 Apr 2026 09:28:54 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5566</guid>

					<description><![CDATA[The bridge structure SO 209 is an important part of the final construction section D1 0136 Říkovice – Přerov of [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="17" data-end="213"><strong><em>The bridge structure SO 209 is an important part of the final construction section D1 0136 Říkovice – Přerov of the new D1 motorway, forming part of the route between Vyškov and Lipník nad Bečvou.</em></strong></p>
<p data-start="215" data-end="455"><em>The structure consists of two parallel bridges: the left bridge in the Ostrava – Brno direction and the right bridge in the Brno – Ostrava direction. The total width of the superstructure is 17.70 m (left bridge) and 15.55 m (right bridge).<br />
</em><em>The main load-bearing structure of the bridge consists of two independent composite steel-concrete twin-girder structures with 20 spans and a top deck slab, founded on common deep foundations. From a structural point of view, both bridge structures form a continuous longitudinal beam.</em></p>
<p data-start="744" data-end="821"><em>The project was successfully completed with a total value of <strong>CZK 224,311,275</strong>.</em></p>
<p data-start="55" data-end="225">
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/bridge-prerov/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Bypass road bridge over the Biskupice Canal and the Váh River</title>
		<link>https://www.stavokov.sk/en/references/bypass-road-bridge-over-the-biskupice-canal-and-the-vah-river/</link>
					<comments>https://www.stavokov.sk/en/references/bypass-road-bridge-over-the-biskupice-canal-and-the-vah-river/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Wed, 15 Apr 2026 08:14:18 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5605</guid>

					<description><![CDATA[The new road bridge over the Biskupice Canal and the Váh River in Trenčín is a major bridge structure (SO [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="0" data-end="447"><strong><em>The new road bridge over the Biskupice Canal and the Váh River in Trenčín is a major bridge structure (SO 202) on the south-eastern bypass of the city, forming part of the realignment of Road I/61. The bridge, approximately 540 m in length, connects the airport area and Trenčianske Biskupice, with the aim of relieving traffic in the city centre. Our company was responsible for the fabrication and erection of the steel structure of this bridge.</em></strong></p>
<p data-start="449" data-end="788"><em>The bridge structure is designed with two expansion units, consisting of two continuous girders. The first unit (a composite steel–concrete structure) has three spans with lengths of 65.0 + 110.0 + 68.85 m. The second unit (a prestressed concrete structure) consists of six spans with lengths of 50.85 + 52.0 + 52.0 + 52.0 + 44.0 + 29.0 m.<br />
</em><em>The composite steel–concrete structure is designed as a box girder with variable depth and haunched sections towards the supports. The structural depth is 2.5 m in midspan and 6.0 m above the supports. The variation in depth is achieved through a parabolic haunch.<br />
</em><em>The prestressed concrete structure (second expansion unit) is designed with a constant structural depth of 2.5 m, with a stiffening cross beam provided above the supports.<br />
</em><em>The weight of the structure is 1,170 tonnes, the span length is 524 m, and the total bridge length is 539.2 m.</em></p>
<p data-start="1341" data-end="1445" data-is-last-node="" data-is-only-node=""><em>You can read more here: Source / <a href="https://www.asb.sk/stavebnictvo/stavba-i-61-trencin-most-je-uz-odovzdana-do-uzivania" target="_blank" rel="noopener">Stavba I/61 Trenčín – most je už odovzdaná do užívania | ASB.sk</a></em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/bypass-road-bridge-over-the-biskupice-canal-and-the-vah-river/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Bridge on Road I/44 over the ČD railway line, Zábřeh–Bludov section</title>
		<link>https://www.stavokov.sk/en/references/bridge-on-road-i-44-over-the-cd-railway-line-zabreh-bludov-section/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Wed, 15 Apr 2026 06:54:31 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5602</guid>

					<description><![CDATA[The bridge on the relocated section of Road I/44 (the Bludov bypass) near Postřelmov carries a high-capacity four-lane roadway over [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="0" data-end="338"><strong>The bridge on the relocated section of Road I/44 (the Bludov bypass) near Postřelmov carries a high-capacity four-lane roadway over the Morava River and the Zábřeh–Bludov railway line. We actively participated in the implementation of this important infrastructure project as part of the construction of a modern transport connection in the region. The bridge structure represented a technically demanding project, with a strong emphasis placed on quality workmanship, safety, and meeting the specified deadlines.</strong></p>
<p data-start="0" data-end="338"><em>The load-bearing structure of the bridges consists of a continuous steel beam system with a composite reinforced concrete slab. In the cross-section, the superstructure is formed by two steel girders with an additional cast-in-place monolithic composite slab. The bridge foundations are deep foundations on bored large-diameter piles. </em><em>On the right side of the abutment, a reinforced concrete retaining wall is connected, stabilising the adjacent slope. On the left side of the abutment, a reinforced and stabilised slope is designed to support the toe of the railway embankment. The bridge is located in a gentle left-hand horizontal curve. The transverse slope of the bridge follows the crossfall of the carriageway on the main route and is one-sided. </em><em>Each superstructure consists of two main welded steel girders. The girders are composite with a reinforced concrete deck slab. The main girders have an asymmetrical cross-section. The centre-to-centre spacing of the main girders is 7.0 m. The girders are designed as full-depth welded plate girders. </em><em>At the supports on abutments and piers, the main girders are interconnected by steel plate cross beams with a symmetrical welded I-section profile. </em><em>The span length is 229.80 m and the total bridge length is 250.25 m.</em></p>
<p data-start="0" data-end="338"><em>The total value of the completed works reached <strong>CZK 138,566,039.</strong></em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Railway bridge on the České Velenice–Plzeň railway line</title>
		<link>https://www.stavokov.sk/en/references/railway-bridge-on-the-ceske-velenice-plzen-railway-line/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 07:01:46 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5547</guid>

					<description><![CDATA[As part of the construction and modernization of railway infrastructure in the Czech Republic, our company participated in the implementation [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="97" data-end="269"><strong>As part of the construction and modernization of railway infrastructure in the Czech Republic, our company participated in the implementation of a railway bridge on the České Velenice–Plzeň railway line. The project included the fabrication and installation of the steel bridge structure, with an emphasis on technical precision, quality workmanship, and safe execution. This bridge structure represents an important part of the railway connection and contributes to the reliable and smooth operation of the line.</strong></p>
<p data-start="97" data-end="269"><em>The bridge consists of a sequence of three simply supported spans. In all spans, the load-bearing structures are steel, fully welded, with a bottom deck and ballast trough. The end spans are designed as parapet girders with a span of 26 m, while the main span consists of a Langer beam (arch-reinforced girder) with a span of 69 m. The superstructure is supported by a monolithic reinforced concrete substructure founded on deep foundations using large-diameter bored piles.</em><br />
<em>Total weight of the steel structure: 619 tonnes</em><br data-start="622" data-end="625" /><em>Total crossing length: 121.00 m</em><br data-start="656" data-end="659" /><em>Total bridge length: 144.50 m</em></p>
<p data-start="97" data-end="269"><em>The project was successfully completed with a total contract value of <strong>CZK 65,009,226.</strong></em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Bridge over the Plavnica River Valley</title>
		<link>https://www.stavokov.sk/en/references/bridge-over-the-plavnica-river-valley/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Tue, 14 Apr 2026 12:41:04 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5594</guid>

					<description><![CDATA[We participated in the construction of the bridge over the Plavnice River valley as part of the D3 motorway section [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="81" data-end="261"><strong>We participated in the construction of the bridge over the Plavnice River valley as part of the D3 motorway section Hodějovice – Třebonín, which forms part of the future bypass of České Budějovice. The bridge structure represented a technically demanding project located in challenging valley terrain, where strong emphasis was placed on precise execution, high-quality workmanship, and compliance with strict construction procedures. The construction of the bridge contributed to the modernization of transport infrastructure and to improving traffic flow along an important motorway corridor in the Czech Republic.</strong></p>
<p data-start="81" data-end="261"><em>The bridge is designed as a continuous composite steel–concrete girder bridge with 11 spans. The cross-section is configured as a twin-girder structure with cantilever overhangs. </em><em>The bridge is supported on column piers using spherical bearings. The foundations are designed as deep foundations on large-diameter bored piles embedded in clay layers.<br />
</em><em>Span length: 436.60 m / </em><em>Total bridge length: 452.00 m</em></p>
<p data-start="81" data-end="261"><em>The total value of the completed works amounted to <strong>CZK 116,493,135</strong>.</em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>New bridge over the Nosice Canal</title>
		<link>https://www.stavokov.sk/en/references/new-bridge-over-the-nosice-canal/</link>
					<comments>https://www.stavokov.sk/en/references/new-bridge-over-the-nosice-canal/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Wed, 15 Apr 2026 12:35:51 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5609</guid>

					<description><![CDATA[We participated in the construction of the new bridge over the Nosice canal for pedestrians and the general public as [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="61" data-end="416"><strong>We participated in the construction of the new bridge over the Nosice canal for pedestrians and the general public as part of the development of modern transport and pedestrian infrastructure in the region. The bridge structure combines functionality with an architecturally and technically interesting design, making it a distinctive feature of the area.</strong></p>
<p data-start="418" data-end="815"><em>The load-bearing structure is designed as a continuous steel box girder suspended from a single pylon by two planes of inclined stays made of multi-strand cables. The construction involved a technically demanding installation of the steel structure, carried out using the incremental launching method, with a strong emphasis on precision, stability, and safety throughout the construction process.<br />
</em><em>The result is a modern bridge structure that improves accessibility for pedestrians and the public while enhancing the infrastructure in the Nosice canal area.</em></p>
<p data-start="978" data-end="1029"><em>The total contract value amounted to <strong>EUR 1,000,053.</strong></em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/new-bridge-over-the-nosice-canal/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Bridge Svit-Štrba</title>
		<link>https://www.stavokov.sk/en/references/bridge-svit-strba/</link>
					<comments>https://www.stavokov.sk/en/references/bridge-svit-strba/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Wed, 15 Apr 2026 06:42:53 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5601</guid>

					<description><![CDATA[Construction: “Modernisation of the Žilina – Košice Railway Line, section Liptovský Mikuláš – Poprad-Tatry, Phase 1” The purpose of the [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="0" data-end="120"><em><strong data-start="0" data-end="17">Construction:</strong> “Modernisation of the Žilina – Košice Railway Line, section Liptovský Mikuláš – Poprad-Tatry, Phase 1”</em></p>
<p data-start="122" data-end="459"><em>The purpose of the bridge is to carry a double-track railway line with a design speed of 160 km/h over the Poprad River. The new bridge consists of two steel superstructures with ballasted track and an upper deck system. The track design speed on the bridge is 160 km/h. The bridge carries two main tracks with a mutual spacing of 5.0 m.<br />
</em><em>At the bridge location, the railway runs on an embankment approximately 2.0 m high. Each track is carried by a separate steel plate girder structure with an orthotropic deck. The superstructure is divided into erection segments. Assembly and workshop joints are welded.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/bridge-svit-strba/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>R2 Bridge over the Slatina River and Road III/05098</title>
		<link>https://www.stavokov.sk/en/references/r2-bridge-over-the-slatina-river-and-road-iii-05098/</link>
					<comments>https://www.stavokov.sk/en/references/r2-bridge-over-the-slatina-river-and-road-iii-05098/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Tue, 14 Apr 2026 12:53:08 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5595</guid>

					<description><![CDATA[On the project of the R2 bridge over the Slatina River and road III/05098, our company participated in the fabrication [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="20" data-end="503"><strong>On the project of the R2 bridge over the <span class="hover:entity-accent entity-underline inline cursor-pointer align-baseline"><span class="whitespace-normal">Slatina</span></span> River and road III/05098, our company participated in the fabrication and erection of the steel structure of a major bridge object constructed as part of the R2 expressway near <span class="hover:entity-accent entity-underline inline cursor-pointer align-baseline"><span class="whitespace-normal">Detva</span></span>. The project represented an important component in the development of transport infrastructure in central Slovakia and contributed to improved traffic safety and traffic flow in the region.</strong></p>
<p data-start="505" data-end="899"><em>The bridge structure spans both the Slatina River and road III/05098 and was designed as part of the four-lane divided R2 expressway of category R 24.5/100. The bridge width arrangement corresponds to the parameters of a modern high-speed road with a clear width of 11.25 meters for each traffic direction. In spans 1 and 2, the bridge is widened due to the connection to the Detva interchange.<br />
</em><em>The steel structure of the bridge has a total weight of 1,465 tons and a steel section length of 349.9 meters, making the project one of the significant bridge realizations in our portfolio. The execution required a high level of technical precision, coordination, and experience in the erection of large-scale steel structures for transport infrastructure projects.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/r2-bridge-over-the-slatina-river-and-road-iii-05098/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Bevlava Cycle Path</title>
		<link>https://www.stavokov.sk/en/references/bevlava-cycle-path/</link>
					<comments>https://www.stavokov.sk/en/references/bevlava-cycle-path/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 16 Apr 2026 10:58:53 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5614</guid>

					<description><![CDATA[Our company participated in the realization of the cycling bridge between Horní Lideč and Valašské Příkazy by delivering the steel [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="62" data-end="266"><strong>Our company participated in the realization of the cycling bridge between <span class="hover:entity-accent entity-underline inline cursor-pointer align-baseline"><span class="whitespace-normal">Horní Lideč</span></span> and <span class="hover:entity-accent entity-underline inline cursor-pointer align-baseline"><span class="whitespace-normal">Valašské Příkazy</span></span> by delivering the steel structure of this exceptional 60-meter bridge, which forms an important part of the international long-distance cycling route BEVLAVA (Bečva – Vlára – Váh). The project represents a significant step in the development of cross-border infrastructure and safe connectivity between the Moravian and Slovak border regions. The cycling bridge also creates new opportunities for tourism and active mobility by connecting the route from Vsetín to the Slovak Považie region. We are proud to have been part of a project that connects not only two riverbanks, but also regions and people.</strong></p>
<p data-start="62" data-end="266"><em>The footbridge structure is designed as a truss system with a top deck spanning 60.0 m, connected to two concrete spans of 16.0 m and 12.0 m. The entire structure acts statically as a continuous beam. </em><em>The load-bearing steel structure consists of two truss girders arranged in a rhombic system, featuring a curved bottom chord made of circular hollow sections interconnected by crossbeams. The main girders are inclined and converge toward the midpoint of the span. </em><em>The deck is designed as a reinforced concrete slab at the level of the top chord. The crossbeams connecting the top chords are embedded in the deck, which ensures the stability of the top chords. The structure is indirectly supported on bearings of the end cross girders.</em></p>
<p data-start="62" data-end="266"><em>The project was completed with a total value of <strong>CZK 12,549,846</strong>.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/bevlava-cycle-path/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Torysa River Bridge</title>
		<link>https://www.stavokov.sk/en/references/torysa-river-bridge/</link>
					<comments>https://www.stavokov.sk/en/references/torysa-river-bridge/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Mon, 13 Apr 2026 09:44:36 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5569</guid>

					<description><![CDATA[On the project of the bridge over the Torysa River in Prešov, our company participated in the fabrication and erection [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="20" data-end="472"><strong>On the project of the bridge over the <span class="hover:entity-accent entity-underline inline cursor-pointer align-baseline"><span class="whitespace-normal">Torysa</span></span> River in <span class="hover:entity-accent entity-underline inline cursor-pointer align-baseline"><span class="whitespace-normal">Prešov</span></span>, our company participated in the fabrication and erection of the steel bridge structure with a total weight of 1,018 tons and a steel section length of 163.42 meters. The project represented an important transport infrastructure development contributing to improved traffic flow and transportation capacity in the city of Prešov.</strong></p>
<p data-start="474" data-end="840"><em>The bridge consists of two separate load-bearing structures, one for each traffic direction. The superstructure was designed as a continuous composite steel-concrete structure with three spans. It is formed by a pair of welded steel plate girders, cross beams, and lattice field cross beams ensuring high load-bearing capacity, stability, and structural reliability. </em><em>At both the end and intermediate supports, the structure is seated on pairs of bearings located beneath the main girders, ensuring optimal load transfer and long-term durability of the bridge. The project confirmed our expertise in the fabrication and erection of technically demanding steel bridge structures and further expanded our portfolio of major infrastructure projects in Slovakia.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/torysa-river-bridge/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Dobrohošť–Dunakiliti Pedestrian and Cycle Bridge</title>
		<link>https://www.stavokov.sk/en/references/dobrohost-dunakiliti-pedestrian-and-cycle-bridge/</link>
					<comments>https://www.stavokov.sk/en/references/dobrohost-dunakiliti-pedestrian-and-cycle-bridge/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Wed, 15 Apr 2026 11:55:16 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5608</guid>

					<description><![CDATA[On the project of the pedestrian and cycling bridge between Dobrohošť and Dunakiliti, our company participated in the execution of [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="20" data-end="584"><strong>On the project of the pedestrian and cycling bridge between <span class="hover:entity-accent entity-underline inline cursor-pointer align-baseline"><span class="whitespace-normal">Dobrohošť</span></span> and <span class="hover:entity-accent entity-underline inline cursor-pointer align-baseline"><span class="whitespace-normal">Dunakiliti</span></span>, our company participated in the execution of the steel load-bearing structure of an important cross-border connection linking the Slovak and Hungarian parts of the Danube region. The project was developed with the aim of increasing the safety and comfort of pedestrians and cyclists while also supporting tourism development in the attractive area near the <span class="hover:entity-accent entity-underline inline cursor-pointer align-baseline"><span class="whitespace-normal">Gabčíkovo Waterworks</span></span> and the old Danube riverbed.</strong></p>
<p data-start="586" data-end="1384"><em>The bridge superstructure consists of two two-span steel truss main girders of constant height, made of steel tubes without vertical members. The lower bridge deck is formed by a composite reinforced concrete slab cooperating with the cross beams of the main load-bearing structure. The structure is supported on elastomeric bearings and designed with emphasis on efficient load transfer, stability, and long-term durability. The central steel support acts statically as a pendulum column. The total structural depth in the span is 2.05 m, while the total bridge width is 5.72 m. The spacing between the cross beams is 3.0 m. Individual members of the truss structure are made of steel tubes. The total length of the load-bearing structure is 54.60 m, while the total bridge length reaches 64.80 m.<br />
</em><em>The project represents a combination of technical efficiency, functionality, and support for sustainable mobility in the cross-border region.</em></p>
<p data-start="1529" data-end="1559"><em>Total contract value: <strong>€ 197,658</strong></em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/dobrohost-dunakiliti-pedestrian-and-cycle-bridge/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Footbridge over the Elbe in Hradec Králové</title>
		<link>https://www.stavokov.sk/en/references/footbridge-over-the-elbe-in-hradec-kralove/</link>
					<comments>https://www.stavokov.sk/en/references/footbridge-over-the-elbe-in-hradec-kralove/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Tue, 14 Apr 2026 07:11:35 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5571</guid>

					<description><![CDATA[We participated in the realization of the steel components of the footbridge over the Elbe River in Hradec Králové, which [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="12" data-end="407"><strong>We participated in the realization of the steel components of the footbridge over the Elbe River in <span class="hover:entity-accent entity-underline inline cursor-pointer align-baseline"><span class="whitespace-normal">Hradec Králové</span></span>, which received the prestigious &#8220;<span class="hover:entity-accent entity-underline inline cursor-pointer align-baseline"><span class="whitespace-normal">Czech Architecture Award 2024&#8243;</span></span>. Our scope of supply included steel segments of the load-bearing structure, railings, and other steel elements contributing to the unique architectural expression of the entire structure.<br />
The footbridge was designed as an elegant pedestrian and cycling connection between the two banks of the Elbe River, situated between the Labský Bridge and Tyrš Bridge. The transparent steel-concrete structure enhances the visual openness of the space and naturally integrates into the surrounding urban environment. </strong></p>
<p data-start="12" data-end="407"><em>The load-bearing structure of the footbridge is designed as a slender prestressed segmental deck supported by an external cable system. The walking surface is formed by a concrete structure, while the segments above the individual supports are made of steel. These segments also serve as anchoring points for the external support cables with a diameter of 130 mm. The forces from the external cables are transferred into the concrete segments through steel frames. </em><em>The structure is supported on spherical bearings at the abutments. The steel segment above pier P2 is rigidly connected to the substructure, while the forces from the load-bearing structure are transferred through a shear key and stainless steel rods. </em><em>The footbridge structure spans a total distance of more than 100 metres and asymmetrically divides the bridge into two spans. The main span of 69 m crosses the river itself, while the secondary span of 33 m extends above the riverside area.</em></p>
<p data-start="1688" data-end="1840"><em><strong data-start="1688" data-end="1713">Technical parameters:</strong></em><br data-start="1713" data-end="1716" /><em>Bridge span length: 101.300 m / Total bridge length: 123.060 m / Span arrangement: 69.00 + 33.00 m / Footbridge width: 4.5 m</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/footbridge-over-the-elbe-in-hradec-kralove/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Bridge on Road I/11 – D3 Motorway, Čadca (Bukov–Svrčinovec)</title>
		<link>https://www.stavokov.sk/en/references/bridge-on-road-i-11-d3-motorway-cadca-bukov-svrcinovec/</link>
					<comments>https://www.stavokov.sk/en/references/bridge-on-road-i-11-d3-motorway-cadca-bukov-svrcinovec/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Wed, 15 Apr 2026 06:19:35 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5598</guid>

					<description><![CDATA[For the bridge structure on the D3 Motorway Čadca, Bukov – Svrčinovec project, we carried out the fabrication and installation [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="12" data-end="451"><strong>For the bridge structure on the <span class="hover:entity-accent entity-underline inline cursor-pointer align-baseline"><span class="whitespace-normal">D3 Motorway Čadca, Bukov – Svrčinovec</span></span> project, we carried out the fabrication and installation of the steel load-bearing structure forming an important part of the modern transport connection in northern Slovakia. The project contributed to improved traffic safety and smoother transport flow in the region while diverting transit traffic away from the urban area of <span class="hover:entity-accent entity-underline inline cursor-pointer align-baseline"><span class="whitespace-normal">Čadca</span></span>.</strong></p>
<p data-start="453" data-end="775"><em>The scope of works included the fabrication of the steel bridge structure, including assembly blocks and additional structural steel components. The entire solution was designed with emphasis on high load-bearing capacity, structural stability, and efficient installation while meeting all required technical parameters. </em><em>The steel load-bearing structure consists of nine plate girders connected by end crossbeams. The main structural system of each bridge is formed by continuous I-shaped plate girders. In the cross-section, the structure comprises a total of nine girders grouped into assembly blocks of three girders each. The girder webs are reinforced with vertical stiffeners ensuring the required rigidity of the structure. </em><em>The load-bearing structure is supported on reinforced concrete abutments whose width corresponds to the variable width of the bridge. The substructure consists of end abutments on which the structure is supported by sets of three bearings. The bridge foundation was designed as a deep foundation using large-diameter piles.<br />
</em><em>The realization of the project required precise fabrication of individual steel components, coordinated assembly procedures, and a high level of technical accuracy throughout the entire construction process.</em></p>
<p data-start="1728" data-end="1755"><em><strong data-start="1728" data-end="1753">Technical parameters:<br />
</strong></em><em style="font-size: 16px;">Weight of steel structure: 198 tons / </em><em style="font-size: 16px;">Length of steel structure: 48.24 m / </em><em style="font-size: 16px;">Total value of completed works: <strong>€ 868,920</strong></em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/bridge-on-road-i-11-d3-motorway-cadca-bukov-svrcinovec/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Leharsteg Pedestrian Bridge</title>
		<link>https://www.stavokov.sk/en/references/leharsteg-pedestrian-bridge/</link>
					<comments>https://www.stavokov.sk/en/references/leharsteg-pedestrian-bridge/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Mon, 13 Apr 2026 09:21:05 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5564</guid>

					<description><![CDATA[We carried out a complete reconstruction of the &#8220;Leharsteg pedestrian bridge&#8221;, focusing on restoring its technical condition, increasing the durability [&#8230;]]]></description>
										<content:encoded><![CDATA[<div class="flex flex-col text-sm pb-25">
<section class="text-token-text-primary w-full focus:outline-none [--shadow-height:45px] has-data-writing-block:pointer-events-none has-data-writing-block:-mt-(--shadow-height) has-data-writing-block:pt-(--shadow-height) [&amp;:has([data-writing-block])&gt;*]:pointer-events-auto scroll-mt-[calc(var(--header-height)+min(200px,max(70px,20svh)))]" dir="auto" data-turn-id="request-WEB:d9ee9c33-11a1-47b1-96c6-94670927ea69-9" data-testid="conversation-turn-20" data-scroll-anchor="true" data-turn="assistant">
<div class="text-base my-auto mx-auto pb-10 [--thread-content-margin:var(--thread-content-margin-xs,calc(var(--spacing)*4))] @w-sm/main:[--thread-content-margin:var(--thread-content-margin-sm,calc(var(--spacing)*6))] @w-lg/main:[--thread-content-margin:var(--thread-content-margin-lg,calc(var(--spacing)*16))] px-(--thread-content-margin)">
<div class="[--thread-content-max-width:40rem] @w-lg/main:[--thread-content-max-width:48rem] mx-auto max-w-(--thread-content-max-width) flex-1 group/turn-messages focus-visible:outline-hidden relative flex w-full min-w-0 flex-col agent-turn">
<div class="flex max-w-full flex-col gap-4 grow">
<div class="min-h-8 text-message relative flex w-full flex-col items-end gap-2 text-start break-words whitespace-normal outline-none keyboard-focused:focus-ring [.text-message+&amp;]:mt-1" dir="auto" tabindex="0" data-message-author-role="assistant" data-message-id="4f83302b-af76-4cf3-b268-a0267aa2af99" data-message-model-slug="gpt-5-3" data-turn-start-message="true">
<div class="flex w-full flex-col gap-1 empty:hidden">
<div class="markdown prose dark:prose-invert w-full wrap-break-word light markdown-new-styling">
<p data-start="64" data-end="504"><strong>We carried out a complete reconstruction of the &#8220;Leharsteg pedestrian bridge&#8221;, focusing on restoring its technical condition, increasing the durability of the structure, and extending its service life.</strong></p>
<p data-start="64" data-end="504"><em>The works included thorough abrasive blasting of the steel components, removal of corrosion and contaminants, surface preparation for the application of a new protective coating system, and the subsequent execution of the surface treatment. The reconstruction was performed with a strong emphasis on quality workmanship, long-term protection of the structure against environmental influences, and ensuring reliable functionality.<br />
The result is a refurbished structure with improved corrosion resistance, enhanced aesthetic appearance, and a significantly extended service life. High-quality anti-corrosion protection is one of the key factors in maintaining the safety and long-term reliability of steel pedestrian bridges.</em></p>
</div>
</div>
</div>
</div>
<div class="z-0 flex min-h-[46px] justify-start"></div>
</div>
</div>
</section>
</div>
<div class="pointer-events-none h-px w-px absolute bottom-0" aria-hidden="true" data-edge="true"></div>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/leharsteg-pedestrian-bridge/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Bridge Connecting the Ostrov Area in Trenčín</title>
		<link>https://www.stavokov.sk/en/references/ostrov-bridge-trencin/</link>
					<comments>https://www.stavokov.sk/en/references/ostrov-bridge-trencin/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Mon, 13 Apr 2026 09:25:28 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5565</guid>

					<description><![CDATA[The reconstruction of the bridge connecting the Ostrov area in Trenčín focused on modernizing the transport infrastructure, improving traffic safety, [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="58" data-end="508"><strong>The reconstruction of the bridge connecting the Ostrov area in Trenčín focused on modernizing the transport infrastructure, improving traffic safety, and enhancing conditions for pedestrians and cyclists. The main objective of the project was to widen the roadway, increase the bridge’s traffic capacity, and construct new steel walkways for pedestrians and cyclists. The steel structures of the walkways also serve as a supporting system for utility networks.</strong></p>
<p data-start="510" data-end="933"><em>The reconstruction included strengthening the load-bearing structure of the reinforced concrete girder bridge using external prestressing cables and additional shear reinforcement. The works also involved correcting permanent deflections of the bridge structure, replacing bearings, renewing the roadway surface including waterproofing, and upgrading the drainage system through composite continuous curb drainage channels.<br />
</em><em>As part of the project, new safety barriers, railings, and lighting poles were installed, contributing to greater safety and comfort for all road users. The completed reconstruction resulted in a modern bridge structure that meets current requirements for traffic capacity, safety, and long-term operational reliability.</em></p>
<p data-start="1257" data-end="1293"><em><strong data-start="1257" data-end="1293">Total contract value: €3,496,003</strong></em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/ostrov-bridge-trencin/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Railway Bridge Smiřice – Jaroměř</title>
		<link>https://www.stavokov.sk/en/references/railway-bridge-smirice-jaromer/</link>
					<comments>https://www.stavokov.sk/en/references/railway-bridge-smirice-jaromer/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 16 Apr 2026 11:14:25 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5616</guid>

					<description><![CDATA[SO 240 – Railway Bridge over the Relocated I/33 Road at km 44.179 of the Jaroměř – Dvůr Králové Railway [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="18" data-end="130"><strong data-start="18" data-end="130">SO 240 – Railway Bridge over the Relocated I/33 Road at km 44.179 of the Jaroměř – Dvůr Králové Railway Line</strong></p>
<p data-start="132" data-end="464"><em>The project involved the construction of a permanent single-track railway bridge with a through-deck structure. The primary steel load-bearing structure, weighing 55 tonnes, consists of main girders reinforced with a truss system and composite-connected to the bridge deck. The steel bridge deck structure has a weight of 97 tonnes.<br />
</em><em>The total weight of the bridge’s steel structure is 152 tonnes, with an overall length of 59.55 metres. The structural design was developed with a focus on reliable railway operation, the required load-bearing capacity, and long-term durability of the bridge structure.</em></p>
<p data-start="737" data-end="958"><em>The project was carried out as part of the modernization of transport infrastructure and represents an important element ensuring the safe crossing of the relocated I/33 road along the Jaroměř – Dvůr Králové railway line.</em></p>
<p data-start="960" data-end="999"><em><strong data-start="960" data-end="999">Total project budget: CZK 3,230,100</strong></em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/railway-bridge-smirice-jaromer/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Suspended Steel Footbridge Považský Chlmec</title>
		<link>https://www.stavokov.sk/en/references/footbridge-povazsky-chlmec/</link>
					<comments>https://www.stavokov.sk/en/references/footbridge-povazsky-chlmec/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Wed, 15 Apr 2026 06:58:54 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5603</guid>

					<description><![CDATA[Our company participated in the implementation of the project &#8220;Suspended Steel Footbridge on the Žilina – Považský Chlmec cycling route&#8221; [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><em>Our company participated in the implementation of the project <strong>&#8220;Suspended Steel Footbridge on the Žilina – Považský Chlmec cycling route&#8221;</strong> by manufacturing the steel structure of bridge components and pylons, including surface treatment.</em><br data-start="345" data-end="348" /><em>The footbridge, <strong>with spans of 24.5 + 130 + 20.8 m</strong>, represents one of the longest cycling crossings in the region and significantly contributes to the connection of cycling routes in the Žilina – Strečno – Budatín area.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/footbridge-povazsky-chlmec/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Railway Bridge in Čadca</title>
		<link>https://www.stavokov.sk/en/references/railway-bridge-in-cadca/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 02 Apr 2026 08:36:26 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5499</guid>

					<description><![CDATA[Fabrication of the steel structure for a railway bridge crossing the Čierňanka River The project involved the fabrication of the [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="18" data-end="106"><strong data-start="18" data-end="106">Fabrication of the steel structure for a railway bridge crossing the Čierňanka River</strong></p>
<p data-start="108" data-end="247"><em>The project involved the fabrication of the steel structure for a railway bridge designed to carry a railway line over the Čierňanka River.<br />
</em><em>Our company participated in the implementation of this project by manufacturing the steel structures of the bridge spans. A separate load-bearing structure was designed for each track, which required increasing the track center distance to 8 m compared to the original configuration. </em><em>The reconstruction was carried out through the complete replacement of the existing bridges with new load-bearing structures. The original riveted truss bridges with an open-deck system were replaced by modern fully welded steel bridges featuring a lower orthotropic deck and a trough for continuous ballast track.<br />
</em><em>The new bridge structures have a span of 36 m and represent a modern solution that enhances the reliability and technical standard of the crossing.</em></p>
<p data-start="999" data-end="1027"><em><strong data-start="999" data-end="1018">Contract value: € 554,615</strong></em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Cycling Footbridge over the Vlára River</title>
		<link>https://www.stavokov.sk/en/references/cycle-bridge-over-the-vlara-river/</link>
					<comments>https://www.stavokov.sk/en/references/cycle-bridge-over-the-vlara-river/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Wed, 15 Apr 2026 07:02:37 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5604</guid>

					<description><![CDATA[The proposed cycling footbridge spans the existing Vlára River watercourse, as well as a newly designed cycling route that connects [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="161" data-end="430"><em>The proposed cycling footbridge spans the existing Vlára River watercourse, as well as a newly designed cycling route that connects to the bridge and continues beneath its structure. It also crosses an existing ford used by heavy machinery directly within the riverbed.<br />
</em><em>The footbridge is designed as a single-span steel truss structure with a total length of 49 m. The clear width of the cycling path is 2.5 m, while the total structural width is 3.1 m. The main truss girders have a structural depth of 4200 mm, and the cross-section is of a closed configuration due to the upper bracing system.<br />
</em><em>The structure is equipped with under-deck longitudinal bracing. The main girders are connected via distribution plates to steel plates fixed to elastomeric bearings using bolted connections, allowing for easier future bearing replacement.</em></p>
<p data-start="1000" data-end="1024"><strong><em>Contract value: €230,710</em></strong></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/cycle-bridge-over-the-vlara-river/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Sand loading equipment Duisburg</title>
		<link>https://www.stavokov.sk/en/references/sand-loading-equipment/</link>
					<comments>https://www.stavokov.sk/en/references/sand-loading-equipment/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 08:05:15 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5553</guid>

					<description><![CDATA[&#8220;Sand Loading Facility – Duisburg, Germany&#8221; focused on the fabrication of the steel structure for a process installation designed for [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="isSelectedEnd"><strong>&#8220;Sand Loading Facility – Duisburg, Germany&#8221;</strong> <strong>focused on the fabrication of the steel structure for a process installation designed for sand handling and loading.</strong></p>
<p class="isSelectedEnd"><em>The scope of work included the fabrication of the steel structure in accordance with the project documentation, with particular emphasis on manufacturing precision, high-quality workmanship, and compliance with the specified technical requirements. All structural components were manufactured, inspected, and prepared for delivery prior to on-site installation.</em></p>
<p><em>The supplied steel structure forms the primary supporting framework of the sand loading facility and was designed to meet the required standards for strength, stability, and reliable operation in a demanding industrial environment.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/sand-loading-equipment/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>The Orechovský Stream Alluvial Area in Trenčín</title>
		<link>https://www.stavokov.sk/en/references/fusgangerbrucke-uber-den-orechovsky-potok-in-trencin/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Mon, 02 Mar 2026 14:21:31 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5435</guid>

					<description><![CDATA[The Orechovský Potok Floodplain project forms part of the development of a recreational area in Orechové, a district of Trenčín [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="160" data-end="606"><strong>The Orechovský Potok Floodplain project forms part of the development of a recreational area in Orechové, a district of Trenčín known for its peaceful residential character and abundant greenery. The district derives its name from the walnut groves that historically shaped the area. Thanks to its convenient access to the city center and proximity to recreational zones, Orechové is an attractive location for both living and leisure activities.</strong></p>
<p data-start="608" data-end="960"><em>The aim of the project was to improve accessibility and connectivity between the Orechovský Potok floodplain and the existing network of pedestrian and cycling routes. The new footbridge provides a safe connection between the Váh River embankment and the planned natural park, creating new opportunities for recreation for residents and visitors alike.<br />
</em><em>The main structure consists of a steel footbridge supported by reinforced concrete abutments on both banks. The project also includes gabion retaining walls, a staircase, and access pathways constructed from concrete and paving blocks. The bridge deck is made of durable black locust (acacia) timber, ensuring both longevity and a natural appearance that blends harmoniously with the surrounding landscape.<br />
</em><em>Our company was responsible for the fabrication, installation, and erection of the steel structure with a total weight of approximately 14 tonnes. The completed bridge provides a modern and aesthetically pleasing connection between urban recreational routes, the natural park, and the cycling trail <strong>“By Bicycle in the Footsteps of History&#8221;</strong>, while respecting the character of the surrounding environment.</em></p>
<p data-start="1775" data-end="1802"><em><strong data-start="1775" data-end="1793">Project Value:</strong> <b> € 244,870</b></em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Hall for fruit FRUCTOP Ostratice</title>
		<link>https://www.stavokov.sk/en/references/hall-for-fruit-fructop-ostratice/</link>
					<comments>https://www.stavokov.sk/en/references/hall-for-fruit-fructop-ostratice/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 05:44:10 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5541</guid>

					<description><![CDATA[Complete construction of a climate-controlled storage hall for fruit]]></description>
										<content:encoded><![CDATA[<p><em>Complete construction of a climate-controlled storage hall for fruit</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/hall-for-fruit-fructop-ostratice/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Žilina Trolleybus Depot</title>
		<link>https://www.stavokov.sk/en/references/zilina-trolleybus-depot/</link>
					<comments>https://www.stavokov.sk/en/references/zilina-trolleybus-depot/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 16 Apr 2026 08:40:34 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5613</guid>

					<description><![CDATA[For Metrostav Slovakia, we participated in the construction and modernization of the trolleybus maintenance depot in Žilina. Our scope of [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="PDq2pG_selectionAnchorContainer" data-start="1047" data-end="1403"><em>For <strong>Metrostav Slovakia</strong>, we participated in the construction and modernization of the trolleybus maintenance depot in Žilina. Our scope of work included the fabrication and installation of steel structures, including primary structural elements, frames for façade infill systems, parapet brackets, and supporting structures for sandwich partition walls.</em></p>
<p data-start="1405" data-end="1792"><em>The project required precise fabrication of individual steel components, accurate on-site installation, and strict compliance with the project documentation. Through high-quality workmanship and effective coordination of the installation works, a modern maintenance facility was delivered, meeting demanding standards for functionality, safety, and long-term operational reliability.</em></p>
<p data-start="1794" data-end="1828"><strong><em>Project value: EUR 1,078,155 </em></strong></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/zilina-trolleybus-depot/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Bridge in Porúbka</title>
		<link>https://www.stavokov.sk/en/references/brucke-in-porubka/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 06 Mar 2026 08:55:10 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5437</guid>

					<description><![CDATA[The subject of the contract is the execution / fabrication and installation of the bridge steel structure. The load-bearing structure [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="104" data-end="411"><em>The subject of the contract is the execution / fabrication and installation of the bridge steel structure. The load-bearing structure consists of a simply supported composite girder. The bridge comprises a single span with a length of 26.23 m. The total length of the load-bearing structure is 28.611 m.</em></p>
<p data-start="413" data-end="722"><em>The structure is designed as a six-girder system made of welded plate girders (I-sections) of constant depth. The steel girders are compositely connected with a reinforced concrete deck slab with a thickness of 250 mm. The centre-to-centre spacing of the girders is 2.05 m, and the deck width is 11.650 m.</em></p>
<p data-start="724" data-end="1055"><em>The top surface of the slab follows the transverse slope of the roadway – a single-sided 3.0% crossfall with a drainage channel at the right edge. The longitudinal gradient of the load-bearing structure follows the vertical alignment of the bridge. The axis of the load-bearing structure is parallel to the axis of the roadway.</em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Košice Maintenance Base Modernization</title>
		<link>https://www.stavokov.sk/en/references/kosice-maintenance-base-modernization/</link>
					<comments>https://www.stavokov.sk/en/references/kosice-maintenance-base-modernization/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 23 Apr 2026 06:31:22 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5625</guid>

					<description><![CDATA[For TSS GRADE, a.s., we carried out the fabrication and installation of the steel structure for the tram depot hall [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="PDq2pG_selectionAnchorContainer" data-start="1002" data-end="1377"><em>For <strong>TSS GRADE, a.s.</strong>, we carried out the fabrication and installation of the steel structure for the tram depot hall as part of the modernization project of the maintenance facility in Košice. The structure was designed to meet high standards of strength, reliability, and the demanding operational requirements of a facility dedicated to the maintenance of rail vehicles.</em></p>
<p data-start="1379" data-end="1884"><em>The project included the fabrication of individual steel components, their transportation to the construction site, and professional on-site installation in accordance with the project documentation. Particular emphasis was placed on precision workmanship, high-quality structural details, and effective coordination with other construction trades. The completed hall provides a modern and functional environment for tram servicing and maintenance while ensuring safe and reliable long-term operation.</em></p>
<p data-start="1886" data-end="1918"><strong><em>Project value: EUR 1,199,833</em></strong></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/kosice-maintenance-base-modernization/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Reconstruction of Railway Bridges on the Plzeň – Žatec Railway Line</title>
		<link>https://www.stavokov.sk/en/references/reconstruction-of-the-plasy-railway-bridge/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 05:50:00 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5542</guid>

					<description><![CDATA[Our company participated in the installation, assembly, and welding of the load-bearing steel structure of the railway bridge as part [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="115" data-end="326"><strong>Our company participated in the installation, assembly, and welding of the load-bearing steel structure of the railway bridge as part of the reconstruction of bridge structures on the Plzeň – Žatec railway line.</strong></p>
<p data-start="328" data-end="533"><em>The original steel structure was replaced with a new truss structure featuring a lower deck and continuous ballast track bed, providing a modern and technically efficient solution for the bridge structure.</em><br />
<em>The project formed part of a comprehensive modernization of the railway line aimed at the renewal of bridge structures and the improvement of safety, reliability, and operational capacity of rail transport.</em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>MTA Slovakia Production Hall</title>
		<link>https://www.stavokov.sk/en/references/mta-slovakia-production-hall/</link>
					<comments>https://www.stavokov.sk/en/references/mta-slovakia-production-hall/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Wed, 15 Apr 2026 06:31:13 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5599</guid>

					<description><![CDATA[Complete construction of a production hall for MTA SLOVAKIA, s.r.o., Bánovce nad Bebravou.]]></description>
										<content:encoded><![CDATA[<p><em>Complete construction of a production hall for MTA SLOVAKIA, s.r.o., Bánovce nad Bebravou.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/mta-slovakia-production-hall/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Skylight – MIRAGE Shopping Centre Žilina</title>
		<link>https://www.stavokov.sk/en/references/skylight-mirage-shopping-centre-zilina/</link>
					<comments>https://www.stavokov.sk/en/references/skylight-mirage-shopping-centre-zilina/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 08:22:34 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5555</guid>

					<description><![CDATA[For the MIRAGE Shopping Centre in Žilina, we delivered the complete fabrication and installation of a steel skylight structure. The [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="105" data-end="395"><em>For the MIRAGE Shopping Centre in Žilina, we delivered the complete fabrication and installation of a steel skylight structure. The works included the production of precisely fabricated, geometrically complex steel elements forming a lightweight yet structurally reliable supporting system. </em><em>All components were manufactured according to project specifications, including adaptation to the skylight’s complex geometry, and subsequently assembled and installed on the roof structure of the shopping centre. </em><em>The skylight provides natural daylight to the interior spaces while also serving as a distinctive architectural feature. The steel structure was executed with a strong focus on stability, safety, and visual quality.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/skylight-mirage-shopping-centre-zilina/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Production Hall for Cortizo, Nová Baňa</title>
		<link>https://www.stavokov.sk/en/references/production-hall-cortizo/</link>
					<comments>https://www.stavokov.sk/en/references/production-hall-cortizo/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 23 Apr 2026 06:35:31 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5626</guid>

					<description><![CDATA[For Cortizo, we carried out the supply and installation of the steel structure for a 7,500 m² production hall, including [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><em><span style="font-size: 16px;">For </span>Cortizo<span style="font-size: 16px;">, we carried out the supply and installation of the steel structure for a </span>7,500 m²<span style="font-size: 16px;"> production hall, including the supply and installation of crane runway beams. The project was designed with a strong emphasis on functionality, structural stability, and the long-term reliability of the building&#8217;s supporting framework.</span></em></p>
<p data-start="666" data-end="981"><em>All work was carried out in strict accordance with the project documentation and high quality standards. Precise fabrication and installation of the steel structure, combined with efficient coordination of all construction phases, resulted in a modern industrial facility designed for reliable, long-term operation.</em></p>
<p data-start="983" data-end="1013"><em><strong data-start="983" data-end="1013">Project value: EUR 675,000</strong></em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/production-hall-cortizo/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Silos for binder storage</title>
		<link>https://www.stavokov.sk/en/references/silos-for-binder-storage/</link>
					<comments>https://www.stavokov.sk/en/references/silos-for-binder-storage/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 12:14:09 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5557</guid>

					<description><![CDATA[Project Silos for Binder Storage comprised the fabrication and installation of complete steel silos designed for the storage of binders [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="isSelectedEnd"><strong>Project Silos for Binder Storage comprised the fabrication and installation of complete steel silos designed for the storage of binders at the premises of Baumit s.r.o., Rohožník Plant.</strong></p>
<p class="isSelectedEnd"><em>The scope of the project included the fabrication and installation of steel supporting structures, silo shells, silo roofs, service platforms, access walkways, ladders, handrails, and other steel structural components forming a complete structural solution for the silos. The project was carried out with emphasis on high fabrication accuracy, quality of welded joints, compliance with strict technical requirements, and safe installation of individual structural assemblies directly on site.</em></p>
<p><em>The result of the project is a comprehensive steel silo solution designed for long-term operation in the demanding environment of the building materials industry, meeting requirements for strength, stability, tightness, safe operator access, and operational reliability.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/silos-for-binder-storage/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>BBC London – Steel Structure Project</title>
		<link>https://www.stavokov.sk/en/references/bbc-london-steel-structure-project/</link>
					<comments>https://www.stavokov.sk/en/references/bbc-london-steel-structure-project/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 16 Apr 2026 11:20:58 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5617</guid>

					<description><![CDATA[As part of this project, our company was responsible for the fabrication and supply of the steel structure for the [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="isSelectedEnd"><strong>As part of this project, our company was responsible for the fabrication and supply of the steel structure for the BBC headquarters in London.</strong></p>
<p class="isSelectedEnd"><em>The project included the complete fabrication of steel components in accordance with the client&#8217;s specifications and project documentation, as well as their surface treatment and subsequent delivery to the construction site.</em></p>
<p><em>Throughout the project, particular emphasis was placed on manufacturing precision, high-quality workmanship, and compliance with the strict technical and safety standards required for prestigious media and public buildings. The result was a reliable, high-quality steel structure delivered ready for installation as part of the BBC building&#8217;s modernization and development project.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/bbc-london-steel-structure-project/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>AAS Qatar Greenfield</title>
		<link>https://www.stavokov.sk/en/references/aas-qatar-greenfield/</link>
					<comments>https://www.stavokov.sk/en/references/aas-qatar-greenfield/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 23 Apr 2026 06:58:55 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5628</guid>

					<description><![CDATA[The Alloy Addition System (AAS) Qatar Greenfield project involved the fabrication of technological steel structures for an industrial facility in [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>The <strong data-start="1059" data-end="1107">Alloy Addition System (AAS) Qatar Greenfield</strong> project involved the fabrication of technological steel structures for an industrial facility in Qatar.</p>
<p class="isSelectedEnd"><em>The scope of work included the production of steel components designed for the installation of a technological system, with emphasis on manufacturing precision, high-quality workmanship, and compliance with demanding technical requirements.<br />
</em><em>The fabrication of the structural components required thorough quality control, precise processing of individual details, and reliable preparation for subsequent installation. The completed steel structures are designed for long-term operation in demanding industrial environments, meeting requirements for strength, stability, and operational reliability.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/aas-qatar-greenfield/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>PELLENC Production Hall</title>
		<link>https://www.stavokov.sk/en/references/pellenc-production-hall/</link>
					<comments>https://www.stavokov.sk/en/references/pellenc-production-hall/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 12:17:01 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5558</guid>

					<description><![CDATA[As part of the PELLENC production hall project in Nové Mesto nad Váhom, we carried out the fabrication and installation [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="PDq2pG_selectionAnchorContainer" data-start="1003" data-end="1380"><em>As part of the PELLENC production hall project in Nové Mesto nad Váhom, we carried out the fabrication and installation of the steel structure for STABILIT, spol. s r. o. The primary steel structure was designed and manufactured with a strong focus on structural reliability, precision workmanship, and creating an optimal environment for modern manufacturing technologies.</em></p>
<p data-start="1382" data-end="1780"><em>Our scope of work included the fabrication of steel components, their transportation to the construction site, and professional on-site installation in accordance with the project documentation. Precise fabrication, high-quality assembly, and careful execution resulted in a modern production hall that meets demanding standards for safety, functionality, and long-term operational reliability.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/pellenc-production-hall/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Reclaimer for Mondi SCP Ružomberok</title>
		<link>https://www.stavokov.sk/en/references/reclaimer-for-mondi-scp-ruzomberok/</link>
					<comments>https://www.stavokov.sk/en/references/reclaimer-for-mondi-scp-ruzomberok/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 07:15:29 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5548</guid>

					<description><![CDATA[The Reclaimer – Mondi SCP Ružomberok project included the fabrication and installation of steel structures for technological equipment used for [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="isSelectedEnd"><strong>The Reclaimer – Mondi SCP Ružomberok project included the fabrication and installation of steel structures for technological equipment used for the transportation and handling of wood chips in the wood processing industry.</strong></p>
<p class="isSelectedEnd"><em>The scope of work comprised the production and installation of the reclaimer, conveyors, rake assemblies, and other steel components required for the assembly and reliable operation of the technological system. The realization required a high level of manufacturing precision, strict compliance with technical requirements, and effective coordination of all stages from the fabrication of steel components through to their installation on site.<br />
The completed structure provides a durable and reliable solution designed for long-term operation under demanding conditions in the wood processing industry, meeting requirements for strength, functionality, and operational reliability.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/reclaimer-for-mondi-scp-ruzomberok/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Storage Hall for Danubius Fruct Ltd.</title>
		<link>https://www.stavokov.sk/en/references/storage-hall-for-danubius-fruct-ltd/</link>
					<comments>https://www.stavokov.sk/en/references/storage-hall-for-danubius-fruct-ltd/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 16 Apr 2026 13:11:35 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5619</guid>

					<description><![CDATA[As part of the Danubius Fruct storage hall project in Miloslavov, we carried out the fabrication and installation of the [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="PDq2pG_selectionAnchorContainer" data-start="1029" data-end="1446"><em>As part of the Danubius Fruct storage hall project in Miloslavov, we carried out the fabrication and installation of the steel structure for STABILIT, spol. s r. o. The structure was designed for a facility intended for post-harvest fruit processing and storage, with a strong emphasis on structural stability, reliability, and efficient use of the interior space for technological equipment and storage capacity.</em></p>
<p data-start="1448" data-end="1831"><em>Our scope of work included the fabrication of steel components, their transportation to the construction site, and professional on-site installation in accordance with the project documentation. Precise workmanship and high-quality installation resulted in a modern storage facility that meets demanding standards for functionality, safety, and long-term operational reliability.</em></p>
<p data-start="1833" data-end="1867"><strong><em>Project value: EUR 717,753</em></strong></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/storage-hall-for-danubius-fruct-ltd/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Reclaimer &#8211; Botnia, Uruguaj</title>
		<link>https://www.stavokov.sk/en/references/reclaimer-botnia-uruguaj/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 23 Apr 2026 08:48:28 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5630</guid>

					<description><![CDATA[&#8220;The Reclaimer – Botnia, Uruguay&#8221; international project involved the fabrication of steel structures for technological equipment used for the transportation [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="isSelectedEnd"><strong>&#8220;The Reclaimer – Botnia, Uruguay&#8221; international project involved the fabrication of steel structures for technological equipment used for the transportation and handling of wood chips in the wood processing industry.</strong></p>
<p class="isSelectedEnd"><em>The scope of work included the production of the reclaimer, conveyors, rake assemblies, and other steel components required for the installation of the technological system. The delivery for this overseas industrial project required a high level of manufacturing precision, strict quality control, and reliable processing of all structural details. The completed steel structures meet demanding requirements for strength, functionality, and long-term durability, ensuring reliable operation under challenging industrial conditions.</em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Westfield London Shopping Centre</title>
		<link>https://www.stavokov.sk/en/references/westfield-london-shopping-centre/</link>
					<comments>https://www.stavokov.sk/en/references/westfield-london-shopping-centre/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 07:39:56 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5549</guid>

					<description><![CDATA[Our company participated in the fabrication of the steel facade structure and steel corner beams for the Westfield shopping centre [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="18" data-end="159"><strong>Our company participated in the fabrication of the steel facade structure and steel corner beams for the Westfield shopping centre in London.</strong></p>
<p data-start="161" data-end="397"><em>The project involved the precise manufacturing of load-bearing steel components for the facade system, including specially designed corner beams that play a key role in load transfer and the overall structural stability of the building.</em></p>
<p data-start="399" data-end="797"><em>The fabrication process was carried out in accordance with the high-quality standards and technical requirements of this international project, with a strong emphasis on precision, coordination, and compliance with specified tolerances. The finished components were prepared for installation as part of the large-scale construction of one of London’s most prominent retail and leisure destinations.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/westfield-london-shopping-centre/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Water tower</title>
		<link>https://www.stavokov.sk/en/references/water-tower/</link>
					<comments>https://www.stavokov.sk/en/references/water-tower/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 12:29:32 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5560</guid>

					<description><![CDATA[The Water Tank Support Tower – France project focused on the fabrication of a steel support structure for a water [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="isSelectedEnd"><strong>The Water Tank Support Tower – France</strong> <strong>project focused on the fabrication of a steel support structure for a water tank.</strong></p>
<p class="isSelectedEnd"><em>The scope of work included the fabrication of the steel structure with a strong emphasis on manufacturing precision, high-quality workmanship, and compliance with the technical requirements of the project documentation. All structural components were manufactured, inspected, and prepared for delivery to facilitate efficient on-site assembly.</em></p>
<p><em>The completed steel structure provides a robust and reliable support solution for the water tank, meeting the required standards for strength, stability, and long-term durability.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/water-tower/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Ethylene Storage Tank</title>
		<link>https://www.stavokov.sk/en/references/ethylene-storage-tank/</link>
					<comments>https://www.stavokov.sk/en/references/ethylene-storage-tank/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 17 Apr 2026 11:26:09 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5620</guid>

					<description><![CDATA[The Ethylene Storage Tank project involved the fabrication and installation of a steel structure for pipe racks within the Slovnaft [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="isSelectedEnd"><strong>The Ethylene Storage Tank project involved the fabrication and installation of a steel structure for pipe racks within the Slovnaft industrial complex in Bratislava.</strong> The project was carried out for AVA-stav, Galanta.</p>
<p class="isSelectedEnd"><em>The scope of work included the fabrication of steel structures intended for technological infrastructure, with a strong emphasis on manufacturing precision, high-quality workmanship, and compliance with the project&#8217;s technical requirements. The project also included the professional installation of the steel structure directly at the construction site.<br />
</em><em>The result is a reliable steel structure designed for long-term operation in the demanding environment of the petrochemical industry, meeting the required standards for strength, stability, and operational reliability.</em></p>
<p class="isSelectedEnd"><em>The total project value amounted to <strong>EUR 1,697,810.</strong><br />
</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/ethylene-storage-tank/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Operational building of SEC spol. s r.o.</title>
		<link>https://www.stavokov.sk/en/references/operational-building-of-sec-spol-s-r-o/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 23 Apr 2026 08:54:26 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5631</guid>

					<description><![CDATA[The project involved the extension and structural modification of the operational building of SEC spol. s r.o., including the construction [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="PDq2pG_selectionAnchorContainer" data-start="210" data-end="562"><em>The project involved the extension and structural modification of the operational building of <strong data-start="304" data-end="324">SEC spol. s r.o.</strong>, including the construction of Assembly Hall G. The scope of work comprised the fabrication and installation of the steel supporting structure, crane runway beams, wall and roof cladding, as well as the installation of windows and doors.</em></p>
<p data-start="564" data-end="867"><em>The project required precise fabrication of individual structural components, careful coordination of construction activities, and strict adherence to high quality standards. The result is a modern industrial facility designed to ensure functionality, reliability, and long-term operational performance.</em></p>
<p data-start="869" data-end="923"><em><strong data-start="869" data-end="923">The total value of the project was EUR 605,627.26.</strong></em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Reclaimer Weyerhäuser, USA</title>
		<link>https://www.stavokov.sk/en/references/reclaimer-weyerhauser-usa/</link>
					<comments>https://www.stavokov.sk/en/references/reclaimer-weyerhauser-usa/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 07:44:03 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5550</guid>

					<description><![CDATA[The Reclaimer Weyerhaeuser project in the USA included the fabrication and supply of steel structures for technological equipment used in [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="isSelectedEnd"><strong>The Reclaimer Weyerhaeuser project in the USA</strong> <strong>included the fabrication and supply of steel structures for technological equipment used in the handling and transportation of wood chips.</strong></p>
<p class="isSelectedEnd"><em>The scope of work comprised the production of the reclaimer, conveyors, rake assemblies, and other steel components essential for the reliable operation of the entire technological system. The fabrication of the individual steel components required a high level of precision, strict compliance with technical specifications, and thorough quality control throughout the manufacturing process. The completed steel structures are designed to withstand demanding operating conditions in the wood processing industry, meeting high standards of strength, functionality, and long-term operational reliability.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/reclaimer-weyerhauser-usa/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>EUROVEA Mixed-Use Development</title>
		<link>https://www.stavokov.sk/en/references/eurovea-mixed-use-development/</link>
					<comments>https://www.stavokov.sk/en/references/eurovea-mixed-use-development/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Mon, 13 Apr 2026 09:07:30 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5561</guid>

					<description><![CDATA[The EUROVEA mixed-use complex represents a modern urban development combining retail, office, and residential spaces. Our scope of work included [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="18" data-end="488"><em>The EUROVEA mixed-use complex represents a modern urban development combining retail, office, and residential spaces. Our scope of work included the reinforced concrete structural frame of the building, comprising load-bearing columns, floor slabs, and reinforcement elements. Throughout the project, we ensured strict compliance with the design documentation, quality standards, and structural requirements, providing a safe and stable framework for the entire complex.</em></p>
<p data-start="490" data-end="539"><em>The total project value amounted to <strong data-start="526" data-end="538">€ 577,300</strong>.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/eurovea-mixed-use-development/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Steel structure for FUNDERMAX</title>
		<link>https://www.stavokov.sk/en/references/steel-structure-for-fundermax/</link>
					<comments>https://www.stavokov.sk/en/references/steel-structure-for-fundermax/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Mon, 20 Apr 2026 07:04:14 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5621</guid>

					<description><![CDATA[The project Steel Structures for FUNDERMAX involved the fabrication of a bolted steel structure for a boiler house, including service [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="isSelectedEnd"><strong>The project Steel Structures for FUNDERMAX involved the fabrication of a bolted steel structure for a boiler house, including service platforms, staircases, and related steel structural components.</strong></p>
<p class="isSelectedEnd"><em>The scope of work comprised the fabrication of steel structures with a strong emphasis on manufacturing accuracy, high-quality workmanship, and compliance with the technical requirements of the project documentation. All structural components were manufactured, inspected, and prepared for delivery to ensure efficient on-site assembly by the installation contractor.</em></p>
<p><em>The completed steel structure provides a reliable and durable solution for the boiler house, designed to meet the required standards for strength, stability, and safe access within an industrial environment.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/steel-structure-for-fundermax/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Reconstruction of the Šmejkalka Bridge</title>
		<link>https://www.stavokov.sk/en/references/reconstruction-of-the-smejkalka-bridge/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Wed, 29 Apr 2026 06:18:18 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5645</guid>

					<description><![CDATA[The Šmejkalka Bridge is a reinforced concrete arch motorway bridge located on the D1 motorway in the Prague-East district, spanning [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="62" data-end="271"><em>The Šmejkalka Bridge is a reinforced concrete arch motorway bridge located on the D1 motorway in the Prague-East district, spanning the Šmejkalka valley. It is the oldest motorway bridge in the Czech Republic.</em></p>
<p data-start="273" data-end="497"><em>Its reconstruction began in 2025, with the aim of achieving a complete renovation while preserving the historic arch. Our company is also involved in this project through the fabrication and installation of steel structures.</em></p>
<p data-start="499" data-end="925"><em>The main load-bearing structure of the bridge deck consists of 24 composite steel–concrete crossbeams with welded I-shaped sections, divided into three phases (central, left, and right parts of the crossbeams). The steel load-bearing structure also includes longitudinal steel connecting elements of the transverse beams with welded I-shaped sections, arranged in two rows above the fixed point of the left arch of the bridge.</em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Saint Gobain Weber Terranova</title>
		<link>https://www.stavokov.sk/en/references/saint-gobain-weber-terranova/</link>
					<comments>https://www.stavokov.sk/en/references/saint-gobain-weber-terranova/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 07:47:29 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5551</guid>

					<description><![CDATA[The Plaster Mix Production Plant project for Saint-Gobain Weber Terranova involved the complete fabrication and installation of steel structures for [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="isSelectedEnd"><strong>The Plaster Mix Production Plant project for Saint-Gobain Weber Terranova</strong> <strong>involved the complete fabrication and installation of steel structures for the production halls and the process tower, including the supply and installation of roof and wall cladding.</strong></p>
<p class="isSelectedEnd"><em>The scope of work comprised the fabrication and erection of the steel supporting structures for the production buildings and the process tower, as well as the installation of the roof and wall cladding system. All activities were carried out with a strong emphasis on manufacturing precision, high-quality workmanship, coordinated on-site execution, and full compliance with the technical requirements of the project documentation.</em></p>
<p><em>The completed project resulted in a modern industrial facility featuring robust steel structures and a high-quality building envelope, designed to ensure structural integrity, operational functionality, and long-term reliability in the production of construction materials.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/saint-gobain-weber-terranova/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>The railway bridge over road III/018149 and the Rakovec stream</title>
		<link>https://www.stavokov.sk/en/references/the-railway-bridge-over-road-iii-018149-and-the-rakovec-stream/</link>
		
		<dc:creator><![CDATA[Martin]]></dc:creator>
		<pubDate>Sat, 26 Oct 2024 21:36:05 +0000</pubDate>
				<guid isPermaLink="false">https://stavokov.martinolsa.sk/?post_type=referencia&#038;p=888</guid>

					<description><![CDATA[On the project “Railway bridge over road III/018149 and the Rakovec stream”, our company participated in the execution of the [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="107" data-end="632"><strong>On the project “Railway bridge over road III/018149 and the Rakovec stream”, our company participated in the execution of the steel structure of a significant railway bridge, which is part of the modernization of the Žilina – Košice railway line in the section between <span class="hover:entity-accent entity-underline inline cursor-pointer align-baseline"><span class="whitespace-normal">Liptovský Mikuláš</span></span> and <span class="hover:entity-accent entity-underline inline cursor-pointer align-baseline"><span class="whitespace-normal">Poprad-Tatry</span></span>. The bridge is located near the municipality of <span class="hover:entity-accent entity-underline inline cursor-pointer align-baseline"><span class="whitespace-normal">Lučivná</span></span> and belongs among the most important bridge structures on this modernized railway section.</strong></p>
<p data-start="634" data-end="966"><em>Technically, it is an impressive structure with a total length of approximately 193 meters, carrying the railway line over a valley, road III/018149, and the Rakovec stream. The structure was designed to meet the high demands of modern railway transport, including improved safety, structural stability, and operational reliability.<br />
</em><em>The project represents another significant milestone in our portfolio and contributes to the modernization of Slovakia’s strategic railway infrastructure. Its execution confirms our long-standing experience in delivering complex steel bridge structures.<br />
</em><em>The bridge is a six-span structure with an upper deck and continuous ballast track. Each track is supported by a separate load-bearing structure. The main girders are mutually separated by a covered expansion joint and are composite steel–concrete structures. The bridge structure is supported on piers and abutments via pot bearings. The abutments and piers are reinforced concrete monolithic structures founded on deep foundations using large-diameter bored piles.</em></p>
<p data-start="1691" data-end="1717"><em>Contract value: <strong>€3,571,246</strong></em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Construction of a New Heat and Power Source</title>
		<link>https://www.stavokov.sk/en/references/construction-of-a-new-heat-and-power-source/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 02 Apr 2026 09:39:30 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5511</guid>

					<description><![CDATA[The facility is a single-storey hall-type building. The main load-bearing structure is designed as a steel frame. The hall also [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><em>The facility is a single-storey hall-type building. The main load-bearing structure is designed as a steel frame. The hall also includes supplementary steel structures such as bracings, crane runways, technological platforms, pipe supports, and other elements, all integrated with the main steel frame.</em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Villa Monte Carlo</title>
		<link>https://www.stavokov.sk/en/references/vila-monte-carlo/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Wed, 29 Apr 2026 08:39:53 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5651</guid>

					<description><![CDATA[Complete reconstruction of the “Villa Monte Carlo” building in Trenčianske Teplice.]]></description>
										<content:encoded><![CDATA[<p><em>Complete reconstruction of the “Villa Monte Carlo” building in Trenčianske Teplice.</em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Extension of the Storage Hall for Valbel</title>
		<link>https://www.stavokov.sk/en/references/extension-of-the-valbel-storage-hall/</link>
					<comments>https://www.stavokov.sk/en/references/extension-of-the-valbel-storage-hall/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 08:01:18 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5552</guid>

					<description><![CDATA[The project involved the fabrication and installation of the steel structure for the extension of a storage hall for Valbel. [&#8230;]]]></description>
										<content:encoded><![CDATA[<div class="flex flex-col text-sm">
<section class="text-token-text-primary w-full focus:outline-none [--shadow-height:45px] has-data-writing-block:pointer-events-none has-data-writing-block:-mt-(--shadow-height) has-data-writing-block:pt-(--shadow-height) [&amp;:has([data-writing-block])&gt;*]:pointer-events-auto scroll-mt-[calc(var(--header-height)+min(200px,max(70px,20svh)))]" dir="auto" data-turn-id="request-WEB:78f5d02c-2adb-423b-9123-55a6f0454999-23" data-testid="conversation-turn-48" data-scroll-anchor="true" data-turn="assistant">
<div class="text-base my-auto mx-auto pb-10 [--thread-content-margin:var(--thread-content-margin-xs,calc(var(--spacing)*4))] @w-sm/main:[--thread-content-margin:var(--thread-content-margin-sm,calc(var(--spacing)*6))] @w-lg/main:[--thread-content-margin:var(--thread-content-margin-lg,calc(var(--spacing)*16))] px-(--thread-content-margin)">
<div class="[--thread-content-max-width:40rem] @w-lg/main:[--thread-content-max-width:48rem] mx-auto max-w-(--thread-content-max-width) flex-1 group/turn-messages focus-visible:outline-hidden relative flex w-full min-w-0 flex-col agent-turn">
<div class="flex max-w-full flex-col gap-4 grow">
<div class="min-h-8 text-message relative flex w-full flex-col items-end gap-2 text-start break-words whitespace-normal outline-none keyboard-focused:focus-ring [.text-message+&amp;]:mt-1" dir="auto" tabindex="0" data-message-author-role="assistant" data-message-id="32690501-85e4-4cb2-8e46-9c253e244af6" data-message-model-slug="gpt-5-3-mini" data-turn-start-message="true">
<div class="flex w-full flex-col gap-1 empty:hidden">
<div class="markdown prose dark:prose-invert w-full wrap-break-word light markdown-new-styling">
<p data-start="880" data-end="1181"><em>The project involved the fabrication and installation of the steel structure for the extension of a storage hall for Valbel. The steel structure was designed and installed with a strong emphasis on structural stability, functionality, and the seamless expansion of the existing storage facilities.</em></p>
<p data-start="1183" data-end="1498"><em>Throughout the project, we focused on the precise fabrication of structural components, high-quality installation, and adherence to the agreed project schedule. The completed extension provides reliable additional storage capacity while meeting the requirements for safety and long-term operational performance.</em></p>
<p data-start="1500" data-end="1530"><strong><em>Project value: EUR 110,000</em></strong></p>
</div>
</div>
</div>
</div>
<div class="z-0 flex min-h-[46px] justify-start"></div>
</div>
</div>
</section>
</div>
<div class="pointer-events-none h-px w-px absolute bottom-0" aria-hidden="true" data-edge="true"></div>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/extension-of-the-valbel-storage-hall/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Railway Bridge Reconstruction in Fiľakovo</title>
		<link>https://www.stavokov.sk/en/references/rekonstrukcia-zeleznicneho-mosta-filakovo-en/</link>
		
		<dc:creator><![CDATA[Martin]]></dc:creator>
		<pubDate>Sun, 02 Nov 2025 10:38:35 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5308</guid>

					<description><![CDATA[Reconstruction of the railway superstructure and substructure, installation of the steel railway bridge structure, bearings, and expansion joints The existing [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="18" data-end="167"><strong data-start="18" data-end="167">Reconstruction of the railway superstructure and substructure, installation of the steel railway bridge structure, bearings, and expansion joints</strong></p>
<p data-start="169" data-end="331"><em>The existing bridge superstructure consists of a steel plate-girder structure with an open-deck bridge system dating from 1949, when the bridge was reconstructed.</em></p>
<p data-start="333" data-end="796"><em>The bridge substructure consists of massive gravity concrete abutments with parallel wing walls. The bridge carries the ŽSR MK and ŽSR DOK+24p utility networks. As part of the comprehensive reconstruction of the railway substructure in the adjacent track section, and due to excessive corrosion of the steel components, it is proposed to remove the entire existing superstructure and replace it with a new steel plate-girder structure with a through ballast deck.</em></p>
<p data-start="798" data-end="1391"><em>The new bridge structure will also comply with the MPP 2.5 clearance requirement. After the necessary demolition of the upper portions of the existing abutments, the superstructure will be supported on the substructure by means of four pot bearings. These bearings will be installed on new bearing plinths, which will be supported along the bearing axis by micropiles founded in competent ground, ensuring that the plinths do not bear directly on the original bridge abutments. The new parallel angle-shaped wing walls of the bearing plinths will be anchored to the existing bridge wing walls.</em></p>
<p data-start="1393" data-end="1688"><em>The selection of a girder bridge structure for a span of 24 m is a standard engineering solution. A through-deck bridge system was chosen in order to minimize the structural depth of the superstructure and thus preserve the maximum possible clearance beneath the bridge for the Q100 flood level.</em></p>
<p data-start="1690" data-end="1814"><em>The bridge span is 24 m, the overall structural height is 2.46 m, and the construction depth ranges from 1.327 m to 1.343 m.</em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Toyota Sales and Service Center</title>
		<link>https://www.stavokov.sk/en/references/toyota-dealership-and-service-center/</link>
					<comments>https://www.stavokov.sk/en/references/toyota-dealership-and-service-center/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Mon, 13 Apr 2026 09:16:57 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5563</guid>

					<description><![CDATA[The project involved the fabrication and installation of the steel structure for a building designed to accommodate a Toyota vehicle [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="158" data-end="533"><em>The project involved the fabrication and installation of the steel structure for a building designed to accommodate a Toyota vehicle sales and service centre. The scope of work included the production and assembly of load-bearing columns, primary beams, and roof frames, forming the main structural system of the facility and ensuring its stability and long-term reliability.</em></p>
<p data-start="535" data-end="864"><em>The project required precise fabrication of steel components, strict compliance with the project documentation, and effective coordination with other construction and technical disciplines. The result is a modern commercial and service facility that meets high standards of quality, safety, and long-term operational performance.</em></p>
<p data-start="866" data-end="896"><em><strong data-start="866" data-end="896">Project value: EUR 342,935</strong></em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/toyota-dealership-and-service-center/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>SUZUKI car showroom</title>
		<link>https://www.stavokov.sk/en/references/suzuki-car-showroom/</link>
					<comments>https://www.stavokov.sk/en/references/suzuki-car-showroom/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Mon, 20 Apr 2026 07:54:05 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5623</guid>

					<description><![CDATA[Turnkey construction and delivery of a SUZUKI car showroom.]]></description>
										<content:encoded><![CDATA[<p><em>Turnkey construction and delivery of a SUZUKI car showroom.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/suzuki-car-showroom/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Production Hall for Seoyon E-Hwa Automotive, Čadca</title>
		<link>https://www.stavokov.sk/en/references/logistic-plant-seoyon-e-hwa-automotive/</link>
					<comments>https://www.stavokov.sk/en/references/logistic-plant-seoyon-e-hwa-automotive/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Wed, 15 Apr 2026 06:12:26 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5597</guid>

					<description><![CDATA[For Seoyon E-Hwa Automotive, we carried out the fabrication and installation of the steel structure for a production hall. The [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="1386" data-end="1677"><em>For <strong>Seoyon E-Hwa Automotive</strong>, we carried out the fabrication and installation of the steel structure for a production hall. The supporting structure was designed and built with a strong emphasis on stability, safety, and reliable operation, meeting the demands of the automotive industry.</em></p>
<p data-start="1679" data-end="2000"><em>Throughout the project, we focused on the precise fabrication of steel components, professional installation, and strict compliance with the project documentation. High-quality workmanship and efficient coordination of all construction phases resulted in a modern industrial facility designed for long-term operation.</em></p>
<p data-start="2002" data-end="2036"><strong><em>Project value: EUR 1,855,167</em></strong></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/logistic-plant-seoyon-e-hwa-automotive/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Pot Bearings</title>
		<link>https://www.stavokov.sk/en/references/pot-bearings/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 02 Apr 2026 09:30:42 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5507</guid>

					<description><![CDATA[Since 1999, we have manufactured over 12,700 pot bearings for projects in the Czech Republic, Poland, Hungary, and Slovakia. Our [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="53" data-end="182">Since 1999, we have manufactured over 12,700 pot bearings for projects in the Czech Republic, Poland, Hungary, and Slovakia.</p>
<p data-start="184" data-end="489">Our pot bearings have been used in numerous major projects, including: D11 Prague – Hradec Králové, D1 Modernization (Czech Republic), D3 Bošílec – Ševětín, D3 Hodějovice – Třebonín, D1 Říkovice – Přerov, D3 Čadca – Bukov – Svrčinovec, R2 Kriváň – Mýtna, and D1 Hričovské Podhradie – Lietavská Lúčka.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Spherical Bearings</title>
		<link>https://www.stavokov.sk/en/references/spherical-bearings/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 02 Apr 2026 09:32:40 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5508</guid>

					<description><![CDATA[Since 2003, we have manufactured over 420 spherical bearings for projects in the Czech Republic and Slovakia. Our spherical bearings [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="53" data-end="167">Since 2003, we have manufactured over 420 spherical bearings for projects in the Czech Republic and Slovakia.</p>
<p data-start="169" data-end="516">Our spherical bearings have been used in a number of major projects, including: D1 Říkovice – Přerov SO209, I/36 Pardubice – Fáblovka, Prague – Troja Bridge, Negrelli Viaduct (Prague), I/48 Frýdek – Místek, III/379 Blansko, III/478 Bridge in Polanka nad Odrou, II/214 Southeast Bypass Cheb SO203, R2 Kriváň – Mýtna, and Lovosice – Česká Lípa.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Elastomeric Bearings</title>
		<link>https://www.stavokov.sk/en/references/elastomeric-bearings/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 02 Apr 2026 09:34:26 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5509</guid>

					<description><![CDATA[Since 1999, we have manufactured over 7,100 elastomeric bearings for projects in the Czech Republic, Poland, and Slovakia. Our elastomeric [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="53" data-end="180">Since 1999, we have manufactured over 7,100 elastomeric bearings for projects in the Czech Republic, Poland, and Slovakia.</p>
<p data-start="182" data-end="570">Our elastomeric bearings have been used in a number of major projects, including: I/65 Jablonec nad Nisou, I/48 Frýdek – Místek, Bečva – Vlára – Váh Cycle Route, Karlovy Vary Drahovický Bridge, Brno Evropská, I/59 Ostrava Radvanice, D1 Modernization (Czech Republic), I/11 Opava Northern Bypass, I/19 Sázava, ŽSR Modernization, R2 Pstruša – Kriváň, and D3 Tábor – Veselí nad Lužnicí.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Bridge Expansion Joints</title>
		<link>https://www.stavokov.sk/en/references/bridge-expansion-joints/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 02 Apr 2026 09:36:21 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5510</guid>

					<description><![CDATA[Since 1999, we have manufactured over 2,170 bridge expansion joints (28,207 linear metres), including 110 finger joints since 2017, for [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="53" data-end="247">Since 1999, we have manufactured over 2,170 bridge expansion joints (28,207 linear metres), including 110 finger joints since 2017, for projects in the Czech Republic, Poland, and Slovakia.</p>
<p data-start="249" data-end="599">Our expansion joints have been used in numerous major projects, including: D1 Estakáda Považská Bystrica, R4 Košice – Milhosť, A4 Szarów – Brzesko, D1 Hričovské Podhradie – Lietavská Lúčka, D3 Čadca – Bukov – Svrčinovec, R2 Kriváň – Mýtna, D1 Prešov West – Prešov South, D1 Fričovce – Svinia, D1 Jablonov – Studenec, and D3 Svrčinovec – Skalité.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>National Football Stadium, Bratislava</title>
		<link>https://www.stavokov.sk/en/references/national-football-stadium-bratislava/</link>
					<comments>https://www.stavokov.sk/en/references/national-football-stadium-bratislava/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Tue, 14 Apr 2026 13:06:54 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5596</guid>

					<description><![CDATA[Our company became part of the construction project of the National Football Stadium in Bratislava, which received the prestigious “Building [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="13" data-end="180">Our company became part of the construction project of the <strong>National Football Stadium</strong> in Bratislava, which received the prestigious <strong>“Building of the Year 2019”</strong> award.</p>
<p data-start="182" data-end="699"><em>Our scope of work included the execution of the stadium grandstand roofing structure. The roofing system is characteristically divided according to the cardinal directions into the north, east, west, and south stands. From a structural perspective, the steel structures of the south and east stands are identical. The structure of the north stand was positioned at a lower level in order to avoid shading nearby residential buildings. The west stand structure is supported by the reinforced concrete roof structure.<br />
</em><em>The primary structural concept for all stands is based on a cantilever system. The cantilever spans vary depending on the individual stand type. The cantilevers were designed as truss systems anchored into reinforced concrete structures.</em></p>
<p data-start="942" data-end="1002"><em>The total value of the completed works reached <strong>€ 4,104,342</strong>.</em></p>
<p data-start="1004" data-end="1120"><strong><em>This project received the award for an exceptional and progressive design solution as “Building of the Year 2019”.</em></strong></p>
<p data-start="822" data-end="1064">
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/national-football-stadium-bratislava/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>National Tennis Centre</title>
		<link>https://www.stavokov.sk/en/references/national-tennis-centre/</link>
					<comments>https://www.stavokov.sk/en/references/national-tennis-centre/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Mon, 13 Apr 2026 09:41:21 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5568</guid>

					<description><![CDATA[Our company was responsible for the fabrication and installation of the steel structure and roof cladding of the retractable roof [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="13" data-end="231"><em>Our company was responsible for the fabrication and installation of the steel structure and roof cladding of the retractable roof over the central court of the tennis hall at the <strong>National Tennis Centre in Bratislava.</strong></em></p>
<p data-start="233" data-end="642"><em>The steel structure consists of arched truss girders with a span of 37.0 m, arranged in a modular grid at 3.050 m spacing. The total structural length is 95.3 m, including a 3.0 m expansion joint field. The gable walls are designed as 200 mm thick cast-in-place reinforced concrete structures. The theoretical depth of the truss girder is 800 mm, with a top chord radius of 28.0 m and an arch rise of 7.1 m.<br />
</em><em>The trusses are pin-supported on reinforced concrete walls, with every sixth arch additionally stabilized by a tension tie. The top and bottom chords as well as the diagonals are designed from tubular profiles. Longitudinal stability is ensured by trussed bracing elements anchored into the end reinforced concrete gable walls, while perimeter roof bracing is also designed using tubular members.<br />
</em><em>The roof steel structure was divided into two parts: a fixed roof structure supported by reinforced concrete columns with installed steel heads (each weighing 12 t), and the main load-bearing truss system resting on these steel heads via sliding bearings. In the central part of the fixed roof, an opening of 18 × 41 m is provided, above which a retractable roof is installed.</em></p>
<p data-start="1424" data-end="1507"><strong><em>The project was awarded the main prize and the title “Building of the Year 2004”.</em></strong></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/national-tennis-centre/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Ice rink of ŠK Matador Púchov</title>
		<link>https://www.stavokov.sk/en/references/ice-rink-of-sk-matador-puchov/</link>
					<comments>https://www.stavokov.sk/en/references/ice-rink-of-sk-matador-puchov/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 08:10:59 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5554</guid>

					<description><![CDATA[As part of the reconstruction of the ŠK Matador Púchov ice stadium, our company delivered a steel structure with an [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="12" data-end="360"><em>As part of the reconstruction of the <strong>ŠK Matador Púchov</strong> ice stadium, our company delivered a steel structure with an <strong>span of up to 32 meters — without the need for any additional supporting elements</strong>. This technical solution made it possible to create a spacious open area that meets the demanding requirements of a modern sports facility.<br />
</em><em>The precise fabrication of individual steel components, careful preparation, and professional installation ensured high structural stability, long service life, and maximum safety of the entire building, even under significant structural loads.<br />
</em><em>This project demonstrates our experience in delivering technically demanding constructions, where we combine modern technological processes, professional know-how, and a strong focus on quality workmanship. At the same time, it confirms our ability to provide reliable solutions for sports and industrial buildings within agreed deadlines and at a high professional standard.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/ice-rink-of-sk-matador-puchov/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Púchov Sports Complex</title>
		<link>https://www.stavokov.sk/en/references/puchov-sports-complex/</link>
					<comments>https://www.stavokov.sk/en/references/puchov-sports-complex/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Mon, 13 Apr 2026 09:14:19 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5562</guid>

					<description><![CDATA[Our company carried out the fabrication and installation of the steel structure, including cladding works, for the “Púchov Sports Complex” [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="13" data-end="162"><em>Our company carried out the fabrication and installation of the steel structure, including cladding works, for the <strong>“Púchov Sports Complex”</strong> project.</em></p>
<p data-start="164" data-end="495"><em>The building forms an extension of a multifunctional sports hall with overall dimensions of 42.0 × 58.65 m, while the hotel section is extended to a width of 43.41 m. Functionally, the building is divided into a basement section with storage facilities and a wellness area with swimming pools, a tennis hall, and a hotel section.<br />
</em><em>The completed steel structure consists of columns, trusses, girders, and horizontal bracing systems, including supporting structures for walkways and the spectator stand. From a structural perspective, the building represents a combined skeletal system composed of reinforced concrete columns and steel roof structures. The vertical load-bearing elements are reinforced concrete columns arranged in a modular grid, positioned at 5.5 m intervals on the shorter side and 6 m intervals on the longer side of the building perimeter.<br />
</em><em>Steel truss girders with a pitched-roof configuration are installed longitudinally on the columns, into which steel lattice beams are anchored. This solution created a lightweight yet flexible spatial truss structure. The perimeter walls are made of prefabricated insulated concrete panels, above which a lightweight sandwich façade system was installed, consisting of trapezoidal sheet metal, thermal insulation, and steel cassette panels.<br />
</em><em>The entire structure was designed and executed efficiently, safely, and in compliance with current applicable technical standards.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/puchov-sports-complex/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Trenčín Ice Hockey Academy</title>
		<link>https://www.stavokov.sk/en/references/trencin-ice-hockey-academy/</link>
					<comments>https://www.stavokov.sk/en/references/trencin-ice-hockey-academy/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 23 Apr 2026 06:39:36 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5627</guid>

					<description><![CDATA[Our company carried out the fabrication and installation of the steel structure for the Hockey Academy in Trenčín, with a [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="13" data-end="360"><em>Our company carried out the fabrication and installation of the steel structure for the <strong>Hockey Academy</strong> in Trenčín, with a total project value of <strong>€ 676,993</strong>. The project included the complete production, supply, and professional installation of steel structural elements, including on-site coordination of individual construction phases in Trenčín.<br />
</em><em>The execution was carried out in accordance with the investor’s requirements, with a strong emphasis on high-quality workmanship, precise fabrication in compliance with applicable standards, and adherence to the agreed schedule. Our company covered the entire process, from technical production preparation through the fabrication of steel components to their final installation on site.<br />
</em><em>The project represented a significant contract in the field of sports infrastructure and confirmed our experience and capabilities in delivering complex and large-scale steel structures.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/trencin-ice-hockey-academy/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Estadio de Bata – Steel Structure</title>
		<link>https://www.stavokov.sk/en/references/estadio-de-bata-steel-structure/</link>
					<comments>https://www.stavokov.sk/en/references/estadio-de-bata-steel-structure/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 16 Apr 2026 11:30:20 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5618</guid>

					<description><![CDATA[The fabrication of the steel structure for the football stadium project “ESTADIO DE BATA” represented a significant and technically interesting [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="80" data-end="509"><em>The fabrication of the steel structure for the football stadium project <strong>“ESTADIO DE BATA”</strong> represented a significant and technically interesting realization with a total volume of 609 tons of steel structures. The project involved the production of individual structural components intended for a modern sports stadium, with emphasis placed on high manufacturing precision, production quality, and adherence to required deadlines.<br />
</em><em>During the execution, the experience of our production team in the field of manufacturing load-bearing steel structures for large construction projects was fully utilized. The production included technologically demanding structural elements that had to meet strict requirements for strength, safety, and installation accuracy.</em></p>
<p data-start="840" data-end="1073"><em>The <strong>“ESTADIO DE BATA”</strong> project is one of our important international realizations and at the same time proof of our ability to provide steel structure fabrication also for large-scale and architecturally interesting sports facilities.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/estadio-de-bata-steel-structure/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>National Tennis Centre Training Hall</title>
		<link>https://www.stavokov.sk/en/references/national-tennis-centre-training-hall/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 23 Apr 2026 07:04:11 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5629</guid>

					<description><![CDATA[For the training hall of the National Tennis Centre Bratislava, our company provided the complete fabrication and installation of the [&#8230;]]]></description>
										<content:encoded><![CDATA[<p><em>For the training hall of the National Tennis Centre Bratislava, our company provided the complete fabrication and installation of the steel structure. The project combined modern technologies, high-quality craftsmanship, and professional coordination throughout all stages of the construction process. The result is a stable and reliable structure that meets the high standards required for modern sports facilities.</em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>City Arena Trnava – Roof Structure for Stadium</title>
		<link>https://www.stavokov.sk/en/references/city-arena-trnava-anton-malatinsky-football-stadium/</link>
					<comments>https://www.stavokov.sk/en/references/city-arena-trnava-anton-malatinsky-football-stadium/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Mon, 20 Apr 2026 09:04:15 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5624</guid>

					<description><![CDATA[The roof structure for Anton Malatinský Stadium in Trnava is one of our key steel construction projects. As part of [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="isSelectedEnd">The roof structure for <strong>Anton Malatinský Stadium in Trnava</strong> is one of our key steel construction projects. As part of this project, we carried out the fabrication and installation of the steel roof structure for the south, east and north stands.</p>
<p class="isSelectedEnd"><em>The scope of work included the fabrication of steel components, surface treatment, transportation to the construction site, and professional on-site installation. Throughout the project, we placed great emphasis on precision, safety and strict adherence to the agreed schedule.<br />
</em><em>The result is a high-quality roof structure that enhances spectator comfort while meeting demanding standards for functionality, durability and aesthetic appearance.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/city-arena-trnava-anton-malatinsky-football-stadium/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Atrium and Skylight Roofing &#8211; PA CENTRÁL Bratislava</title>
		<link>https://www.stavokov.sk/en/references/atrium-and-skylight-roofing-pa-central-bratislava/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 02 Apr 2026 09:06:26 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5503</guid>

					<description><![CDATA[For the PA Central Bratislava project, a large mixed-use building with a footprint of approximately 124 × 147 metres and [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="93" data-end="357"><em>For the PA Central Bratislava project, a large mixed-use building with a footprint of approximately 124 × 147 metres and four underground floors, we were responsible for the fabrication and installation of steel structures for the atrium and skylight roofing.</em></p>
<p data-start="359" data-end="613"><em>The building was constructed as a single expansion joint unit, divided into several independent sections, which allowed for phased construction. After the cladding was completed, the structure was monolithically integrated into a fully functional unit.</em></p>
<p data-start="615" data-end="901"><em>Our team manufactured precise and technically demanding steel structures forming the load-bearing system of the skylights—an important architectural and functional element of the building. Our solutions contributed to creating a modern, bright, and energy-efficient interior space.</em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Steel structure for &#8220;Baker Street London&#8221;</title>
		<link>https://www.stavokov.sk/en/references/baker-street-london/</link>
					<comments>https://www.stavokov.sk/en/references/baker-street-london/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 16 Apr 2026 06:03:33 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5612</guid>

					<description><![CDATA[The Baker Street project in London is one of our key international steel construction references. As part of this project, [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="isSelectedEnd">The <strong>Baker Street project in London</strong> is one of our key international steel construction references. As part of this project, we were responsible for the fabrication and flat pre-assembly of the steel grid structure and rafters, forming an essential part of the load-bearing steel framework.</p>
<p class="isSelectedEnd"><em>The fabrication process was carried out with a strong focus on maximum precision, superior workmanship, and the seamless integration of individual structural components. The project also included flat pre-assembly, ensuring the steel structure was efficiently prepared for final installation on site.<br />
</em><em>The total weight of the supplied steel structure was <strong>214 tonnes</strong>, reflecting both the scale and technical complexity of this international project. The result was a high-quality steel structure that met the highest standards of precision, reliability, and structural performance.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/baker-street-london/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>The United States Institute of Peace</title>
		<link>https://www.stavokov.sk/en/references/united-states-institute-of-peace/</link>
					<comments>https://www.stavokov.sk/en/references/united-states-institute-of-peace/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 12:10:38 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5556</guid>

					<description><![CDATA[The United States Institute of Peace project included the fabrication of steel edge girder structures, which form an essential part [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="isSelectedEnd"><strong>The United States Institute of Peace</strong> project included the fabrication of steel edge girder structures, which form an essential part of the building&#8217;s load-bearing system.</p>
<p class="isSelectedEnd"><em>The scope of work covered the precise manufacturing of individual structural components, comprehensive quality control, and complete preparation for on-site installation in accordance with the project documentation. Throughout the fabrication process, we placed great emphasis on precision, high-quality workmanship, and the reliability of every structural detail. The completed steel structure meets demanding technical requirements for strength, stability, and long-term durability, contributing to the overall safety and reliable performance of the building.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/united-states-institute-of-peace/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Faculty of Arts, Comenius University in Bratislava</title>
		<link>https://www.stavokov.sk/en/references/faculty-of-arts-comenius-university-in-bratislava/</link>
					<comments>https://www.stavokov.sk/en/references/faculty-of-arts-comenius-university-in-bratislava/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Wed, 15 Apr 2026 12:47:07 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5610</guid>

					<description><![CDATA[The Faculty of Arts of Comenius University in Bratislava is one of our significant projects in the field of steel [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="isSelectedEnd">The <strong>Faculty of Arts of Comenius University in Bratislava</strong> is one of our significant projects in the field of steel structures. As part of this project, we carried out the construction of the atrium roof and the fabrication of steel-concrete orthotropic slabs, which form an essential part of the building&#8217;s load-bearing structure.</p>
<p class="isSelectedEnd"><em>The project required the precise fabrication of individual structural components, strict compliance with the project documentation, and the highest standards of workmanship. Throughout the project, we placed great emphasis on technical accuracy, reliability, and the seamless coordination of all stages of the works.<br />
</em><em>The result is a high-quality atrium roof together with steel-concrete orthotropic slabs that meet demanding requirements for load-bearing capacity, functionality, and long-term durability.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/faculty-of-arts-comenius-university-in-bratislava/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Hotel Elizabeth Underpass</title>
		<link>https://www.stavokov.sk/en/references/hotel-elizabeth-underpass/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Wed, 01 Apr 2026 08:30:37 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5495</guid>

					<description><![CDATA[For the City of Trenčín, we fabricated and supplied the steel supporting structure as part of the reconstruction of the [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="isSelectedEnd"><strong>For the City of Trenčín, we fabricated and supplied the steel supporting structure as part of the reconstruction of the pedestrian underpass entrance near Hotel Elizabeth.</strong></p>
<p class="isSelectedEnd"><em>The project included replacing the original reinforced concrete structure with a modern steel solution, including the supporting framework for glazed roof and wall panels, creating an attractive and functional entrance to one of the busiest pedestrian underpasses in the city centre. Throughout the fabrication process, special attention was paid to the precise manufacturing of all steel components, including DETAN tension rod system details and spider fittings for the glass panels. The completed steel structure meets high standards of strength, safety, and long-term durability while complementing the architectural character of the surrounding public space.</em></p>
<p><em><strong>Contract value:</strong> €215,220</em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Apple Sorting Hall Extension</title>
		<link>https://www.stavokov.sk/en/references/extension-of-the-apple-sorting-hall/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Wed, 13 May 2026 07:26:14 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5702</guid>

					<description><![CDATA[As part of the apple sorting hall extension project in Dunajská Lužná, we carried out the fabrication and installation of [&#8230;]]]></description>
										<content:encoded><![CDATA[<p class="PDq2pG_selectionAnchorContainer" data-start="1279" data-end="1614"><em>As part of the apple sorting hall extension project in Dunajská Lužná, we carried out the fabrication and installation of the steel structure for STABILIT, spol. s r. o. The new extension was designed as a separate structural and fire compartment, expanding the existing facility used for fruit storage and automated apple sorting.</em></p>
<p data-start="1616" data-end="2071"><em>The building is based on a steel structural frame combined with modern wall and roof systems designed to ensure reliable year-round operation. Our work also included the supporting structure for a pedestrian walkway and viewing platform, allowing visitors to safely observe the automated apple sorting process. The completed extension combines efficient industrial functionality with an attractive presentation of the production process to the public.</em></p>
<p data-start="2073" data-end="2107"><strong><em>Project value: EUR 354,717</em></strong></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Extension of an apple sorting facility</title>
		<link>https://www.stavokov.sk/en/references/extension-of-an-apple-sorting-facility-3/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 06:34:36 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5545</guid>

					<description><![CDATA[The project included the fabrication and installation of a steel structure for an extension of an apple sorting facility in [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="77" data-end="342"><em>The project included the fabrication and installation of a steel structure for an extension of an apple sorting facility in Dunajská Lužná. The single-storey extension is structurally and fire-separated from the existing hall and serves primarily for apple storage. The building features a steel frame with insulated sandwich PUR panels forming both the façade (100 mm) and the roof (120 mm). The roof structure consists of timber purlins and glued laminated beams. A walkable gallery and viewing platform at +3.000 m allow visitors to observe the automated apple sorting process, supporting the investor’s goal of making production more accessible and engaging to the public.</em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Steel structure of the EUROVEA TOWER crown</title>
		<link>https://www.stavokov.sk/en/references/steel-structure-of-the-eurovea-tower-crown/</link>
					<comments>https://www.stavokov.sk/en/references/steel-structure-of-the-eurovea-tower-crown/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 12:23:04 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5559</guid>

					<description><![CDATA[Our company participated in the construction of the first skyscraper in Slovakia by fabricating the steel structure of the tower [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="71" data-end="315"><em>Our company participated in the construction of the first skyscraper in Slovakia by fabricating the steel structure of the tower crown. The structure begins at the upper floors (45th floor) and extends above the roof level to a height of 168 m.</em></p>
<p data-start="317" data-end="489"><em>It consists of 12 box-section columns arranged around the perimeter of the building in an irregular triangular layout, interconnected by a system of three horizontal rings.</em></p>
<p data-start="491" data-end="668"><strong><em>The project received an award for exceptional construction quality.</em></strong><br data-start="558" data-end="561" /><em>Read more here: The first Slovak skyscraper wins an award for exceptional construction quality | JTRE </em><em>https://www.jtre.sk/novinky/eurovea_tower_ziskal_cenu_za_mimoriadnu_kvalitu_realizacie_stavby</em></p>
<p data-start="491" data-end="668">
<p data-start="491" data-end="668">
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/steel-structure-of-the-eurovea-tower-crown/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Heliport in Vienna</title>
		<link>https://www.stavokov.sk/en/references/heliport-in-vienna/</link>
					<comments>https://www.stavokov.sk/en/references/heliport-in-vienna/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Mon, 20 Apr 2026 07:46:56 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5622</guid>

					<description><![CDATA[Fabrication of a 130-ton steel structure for a rooftop heliport, including hot-dip galvanizing and high-performance protective coatings.]]></description>
										<content:encoded><![CDATA[<p><em>Fabrication of a 130-ton steel structure for a rooftop heliport, including hot-dip galvanizing and high-performance protective coatings.</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/heliport-in-vienna/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Steel structure for the boat ride in the amusement park</title>
		<link>https://www.stavokov.sk/en/references/steel-structure-for-the-boat-ride-in-the-amusement-park/</link>
					<comments>https://www.stavokov.sk/en/references/steel-structure-for-the-boat-ride-in-the-amusement-park/#respond</comments>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Tue, 05 May 2026 08:43:53 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5700</guid>

					<description><![CDATA[Production of the steel structure for the boat ride in the amusement park &#8220;Flume Ride&#8221;]]></description>
										<content:encoded><![CDATA[<p><em>Production of the steel structure for the boat ride in the amusement park &#8220;Flume Ride&#8221;</em></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.stavokov.sk/en/references/steel-structure-for-the-boat-ride-in-the-amusement-park/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Piping energy bridge</title>
		<link>https://www.stavokov.sk/en/references/piping-energy-bridge/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Fri, 10 Apr 2026 06:42:32 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5546</guid>

					<description><![CDATA[Our company is delivering a turnkey project for a pipe bridge, including earthworks, foundations, and the subsequent supply and installation [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="98" data-end="294"><em>Our company is delivering a turnkey project for a pipe bridge, including earthworks, foundations, and the subsequent supply and installation of the steel structure with trapezoidal sheet cladding. The load-bearing structure consists of two steel truss girders supported in the top chord, forming a spatial truss system. The main truss girders are fully welded. Global stability is ensured by horizontal and vertical diagonal bracing. The structure is supported by steel pylons, which are fixed into the foundations. A secondary structure on the top of the truss system is designed to carry cable trays for utility routing. The bridge is covered with a mono-pitch roof clad with trapezoidal sheet metal.</em></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Elevator Shaft for the Social Services Home</title>
		<link>https://www.stavokov.sk/en/references/elevator-shaft-for-the-social-services-home/</link>
		
		<dc:creator><![CDATA[stavokov]]></dc:creator>
		<pubDate>Thu, 02 Apr 2026 09:43:18 +0000</pubDate>
				<guid isPermaLink="false">https://www.stavokov.sk/?post_type=referencia&#038;p=5512</guid>

					<description><![CDATA[Turnkey Construction – Elevator Shaft The project included earthworks, excavation, and micropiling, followed by a monolithic reinforced concrete base slab [&#8230;]]]></description>
										<content:encoded><![CDATA[<p data-start="53" data-end="97"><strong data-start="53" data-end="95">Turnkey Construction – Elevator Shaft</strong></p>
<p data-start="99" data-end="351"><em>The project included earthworks, excavation, and micropiling, followed by a monolithic reinforced concrete base slab with walls. The lower part of the shaft consists of six micropiles, a bedding layer of concrete, and a reinforced concrete base slab.</em></p>
<p data-start="353" data-end="695"><em>The upper part of the shaft was constructed as a steel structure, clad with sandwich panels. The openings from the shaft to each floor were executed by welding trapezoidal sheets to the steel frame attached to the existing building, upon which the floor layers were built. The level of these floor openings was adjusted to match each floor.</em></p>
<p data-start="697" data-end="831"><em>The top of the shaft is finished with a roof consisting of trapezoidal sheets welded to the steel frame, with thermal insulation.</em></p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
